ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Dimmable LED 2x4 lay in fixtures
by Potseal. 04/23/17 07:18 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
Electrode boilers question
by SteveFehr. 04/21/17 08:32 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,654 Are you busy
169,347 Re: Forum
162,687 Need opinion
Who's Online Now
0 registered members (), 75 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#101441 - 03/18/07 12:24 AM Article 680 Bonding (again)  
George Little  Offline
Member
Joined: Jan 2004
Posts: 1,489
Michigan USA
I was reading in the '05 NEC and it talks about bonding connections in 680.26
Quote
(C) Equipotential Bonding Grid. The parts specified in
680.26(B) shall be connected to an equipotential bonding
grid with a solid copper conductor, insulated, covered, or
bare, not smaller than 8 AWG or rigid metal conduit of
brass or other identified corrosion-resistant metal conduit.
Can someone tell me what "rigid metal conduit of
brass or other identified corrosion-resistant metal conduit." is all about?

edited for typos


George Little

2017 / 2014 NEC & Related Books and Study Guides

#101442 - 03/18/07 12:56 AM Re: Article 680 Bonding (again)  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,069
Estero,Fl,usa
Sometime back when "Batman" was just a comic book character they used red brass conduit for the raceway to underwater lights. That conduit could also be used to tie other elements of the equipotential grid together. I suppose if someone actually used brass conduit for a pool light they could tie the deck grid to the deck box raceway.

There is an interesting interpretation of the deck grid floating around in Florida that says the deck grid must be continuous into the pool shell grid ie:bonded every 12". This came from Don Jhonson CMP17 at a Miami road show.
This was the example Fl IAEI had
Large image

Florida is still struggling with whether they will take 6 over #6 mesh as the grid for the concrete deck.

They are also wondering what you do about "packaged" spas. Is that permanent and needing a bonded deck? The workaround everyone seems to like is an elevated wood/composite deck around the spa. It still is troubling to most if they just drop one on the lanai/patio.


Greg Fretwell

#101443 - 03/19/07 12:49 AM Re: Article 680 Bonding (again)  
ShockMe77  Offline
Member
Joined: Jun 2005
Posts: 821
Rahway, New Jersey
Brass is less susecptable to corrosive damage to the raceway.



Member Spotlight
Scott35
Scott35
Anaheim, CA. USA
Posts: 2,707
Joined: October 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.002s) Memory: 0.7510 MB (Peak: 0.8759 MB) Zlib enabled. Server Time: 2017-04-24 21:09:06 UTC