ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 04/29/17 10:26 AM
201 volt equipment?
by bigpapa. 04/29/17 12:15 AM
Schneider LC1D09
by jraef. 04/28/17 11:05 PM
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,941 Are you busy
169,769 Re: Forum
162,980 Need opinion
Who's Online Now
1 registered members (mbhydro), 88 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#101207 - 02/16/07 08:16 PM Feeder length in industrial cabinet  
slice88  Offline
Junior Member
Joined: Feb 2007
Posts: 1
Temperance, MI USA
Parallel 350's are feeding a 700A disconnect for a stamping press. What is the rule for feeder length inside the cabinet and entry location with respect to disconnect? Sections 312.8 and 409.104, (also 409.30 and 504.30), don't mention this. Thanks


2017 / 2014 NEC & Related Books and Study Guides

#101208 - 02/17/07 09:12 AM Re: Feeder length in industrial cabinet  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
I don't think there is a limit.

That said I make a real effort to enter the enclosure close to the lugs so in the future service techs will not need to move around live conductors even with the disconnect open.


Bob Badger
Construction & Maintenance Electrician
Massachusetts


Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.003s) Memory: 0.7433 MB (Peak: 0.8577 MB) Zlib enabled. Server Time: 2017-04-29 17:34:07 UTC