Puhoi Drill No.2 - 02/20/06 04:30 AM
Yet more pics from RODALCO:
End termination pole. 11 kV cockroach, from Waiwera, rural line mostly 25 or 35 mm² Copper:
RMU(Ring Main Unit), for 600 kVA dry transformer for mining auxillaries:
SDAF 11 kV cables, 2 days before livening. Backfilled with sand on the day of "switch on":
11 kV incoming supply to RMU in local tunnel sub:
SDAF bank:
End termination pole. 11 kV cockroach, from Waiwera, rural line mostly 25 or 35 mm² Copper:
RMU(Ring Main Unit), for 600 kVA dry transformer for mining auxillaries:
SDAF 11 kV cables, 2 days before livening. Backfilled with sand on the day of "switch on":
11 kV incoming supply to RMU in local tunnel sub:
SDAF bank: