ECN Forum
Posted By: VOLTS Class 1 Div 1 - 12/11/02 05:17 PM
Is it ok to have a unclassified area open into an class 1 div 1 that is seperated by a doorway? Should there be an transition area of div 2? 500.5 B (2)3 does not indicate how large the transition area sould be if required.
Posted By: spyder Re: Class 1 Div 1 - 12/11/02 09:08 PM
Engineers and building officials make the call on that stuff. Contact the AHJ and have them make the call.
© ECN Electrical Forums