ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
dsk 13
Admin 4
Recent Posts
electircal ageing test on IPC
by SIAME. 08/15/17 02:43 AM
electrical aging test on IPC
by gfretwell. 08/15/17 12:27 AM
Bathroom electrical
by gfretwell. 08/14/17 02:05 AM
"Line level" audio on Cat 5?
by gfretwell. 08/08/17 10:39 PM
Fire alarm phone lines and color coding
by gfretwell. 08/08/17 10:26 PM
New in the Gallery:
Housebilding DIY wiring
Popular Topics(Views)
239,919 Are you busy
175,496 Re: Forum
167,771 Need opinion
Who's Online Now
0 registered members (), 58 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#95765 - 10/05/05 08:25 AM Commercial Sub Panel  
acetoday  Offline
Member
Joined: Sep 2003
Posts: 35
Manassas, Va
Most of my experience involves residential so I'm not sure how to handle this situation:

SPECIFICS: Customer has requested a load calculation for his restaurant. He is renting out two adjacent areas in the same building for his restaurant. Both areas have 200 AMP Meters and 200 AMP Panels. One has a 60 AMP sub Panel and the other has a 100 AMP Sub Panel.

When I checked the panel here is what I fould:

AREA 1:
The 60 AMP Load center/Sub Panel (Square D, QO)had 24 Spaces. Is it permissable to install a 60AMP Subpanel with 24 spaces?

AREA 2:
The 100 AMP Load center/Sub Panel (Square D, QO)had 8 Spaces. I'm just wondering if whoever installed these got the load centeres mixed up.

Any comments would be greatly appreciated.


2017 / 2014 NEC & Related Books and Study Guides

#95766 - 10/05/05 09:46 PM Re: Commercial Sub Panel  
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
Strictly speaking, there is no connection between the number of circuits and the "size" of the panel.

Do your calculations...square footage, known loads, etc. Compare this to the size of the breaker; do you need more? If so, run new feeders and replace with a larger breaker
Another approach is to turn everything on, and see how many amps are drawn.

There are two major problems with store-front remodels. The first is the mapping and identification of all circuits. Panel directories tend to be inaccurate after a few tenants.
The other major problem is having circuits cross between different spaces. These circuits tend to continue to "cross over" long after the spaces are re-divided. It is in everybody's interest that this situation be avoided.



Member Spotlight
NickD
NickD
Amish Country, PA
Posts: 46
Joined: March 2013
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.002s) Memory: 0.7448 MB (Peak: 0.8616 MB) Zlib enabled. Server Time: 2017-08-18 23:59:29 UTC