ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Lighting Plan
by gfretwell. 10/23/18 11:36 PM
Led Strips
by gfretwell. 10/23/18 11:30 PM
Brookstone Wireless Speakers Recalled
by Admin. 10/22/18 11:23 PM
Briggs & Stratton Recalls Fuel Tank Caps
by Admin. 10/22/18 11:16 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 8 guests, and 24 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Commercial Sub Panel #95765
10/05/05 08:25 AM
10/05/05 08:25 AM
A
acetoday  Offline OP
Member
Joined: Sep 2003
Posts: 35
Manassas, Va
Most of my experience involves residential so I'm not sure how to handle this situation:

SPECIFICS: Customer has requested a load calculation for his restaurant. He is renting out two adjacent areas in the same building for his restaurant. Both areas have 200 AMP Meters and 200 AMP Panels. One has a 60 AMP sub Panel and the other has a 100 AMP Sub Panel.

When I checked the panel here is what I fould:

AREA 1:
The 60 AMP Load center/Sub Panel (Square D, QO)had 24 Spaces. Is it permissable to install a 60AMP Subpanel with 24 spaces?

AREA 2:
The 100 AMP Load center/Sub Panel (Square D, QO)had 8 Spaces. I'm just wondering if whoever installed these got the load centeres mixed up.

Any comments would be greatly appreciated.

2017 / 2014 NEC & Related Books and Study Guides
Re: Commercial Sub Panel #95766
10/05/05 09:46 PM
10/05/05 09:46 PM
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
Strictly speaking, there is no connection between the number of circuits and the "size" of the panel.

Do your calculations...square footage, known loads, etc. Compare this to the size of the breaker; do you need more? If so, run new feeders and replace with a larger breaker
Another approach is to turn everything on, and see how many amps are drawn.

There are two major problems with store-front remodels. The first is the mapping and identification of all circuits. Panel directories tend to be inaccurate after a few tenants.
The other major problem is having circuits cross between different spaces. These circuits tend to continue to "cross over" long after the spaces are re-divided. It is in everybody's interest that this situation be avoided.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mersadrad
mersadrad
Montreal, Quebec, Canada
Posts: 28
Joined: March 2011
Show All Member Profiles 
Top Posters(30 Days)
sparky 11
Admin 7
Popular Topics(Views)
250,697 Are you busy
188,161 Re: Forum
177,856 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.020s Queries: 14 (0.005s) Memory: 0.9439 MB (Peak: 1.0607 MB) Zlib enabled. Server Time: 2018-10-24 05:03:19 UTC