ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
HVDC Greece to Crete
by gfretwell - 08/06/20 02:28 AM
Electrician and Telecomunications
by tonymackers478 - 08/05/20 05:46 AM
310.15 (B) 7 Feeders
by HotLine1 - 07/31/20 02:29 PM
What would be the ideal solution?
by Fleppin - 07/21/20 12:42 AM
NESC question
by gfretwell - 07/16/20 04:17 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
1 registered members (gfretwell), 14 guests, and 14 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
NM-B in Crawl Spaces #94760 08/12/05 06:18 PM
Joined: Mar 2004
Posts: 391
B
BigJohn Offline OP
Member
Does the NEC allow Romex to be run across the bottoms of floor joists in crawl spaces?

This is something I see done all the time, and I thought it was legit because of the accessibility of these places, and I see it pass on inspected new construction. But I can't find any article allowing it or exempting crawlspaces from 300.4.

Maybe everyone (rightfully) assumes that no inspector in their right mind is going into that crawl space to enforce this...?

-John

[This message has been edited by BigJohn (edited 08-12-2005).]

2017 / 2014 NEC & Related Books and Study Guides
Re: NM-B in Crawl Spaces #94761 08/12/05 07:02 PM
Joined: Jul 2004
Posts: 9,513
G
gfretwell Online Content
Member
I suspect they will cite;
334.15 Exposed Work.
In exposed work, except as provided in 300.11(A), the cable shall be installed as specified in 334.15(A) through (C).
(A) To Follow Surface. The cable shall closely follow the surface of the building finish or of running boards.

... if anyone is willing to crawl in there for a peek. [Linked Image]


Greg Fretwell
Re: NM-B in Crawl Spaces #94762 08/13/05 08:33 AM
Joined: Jul 2002
Posts: 717
M
macmikeman Offline
Member
It's not allowed where I'm at, unless # 6 guage or larger cable. I allways run along the face of the joists and drill thru cross blocking. Usually there is a beam holding up them joist and I staple to the face of that for perpendicular to the joist runs.


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
pcsailor
pcsailor
Minneapolis, MN, USA
Posts: 21
Joined: September 2019
Show All Member Profiles 
Top Posters(30 Days)
BigB 3
Popular Topics(Views)
268,485 Are you busy
202,918 Re: Forum
191,312 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3