ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
It's been an interesting career
by gfretwell - 05/23/22 09:29 PM
Material shortages???
by HotLine1 - 05/23/22 01:56 PM
Run Cap subsitution question. Two vs. one
by LarryC - 05/20/22 09:01 PM
New in the Gallery:
240/208 to a house
240/208 to a house
by wa2ise, October 9
Now you know.
Now you know.
by Tom_Horne, September 7
Who's Online Now
0 members (), 37 guests, and 9 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#92949 04/18/05 11:18 PM
Joined: Apr 2005
Posts: 4
I
Itoh Offline OP
Junior Member
We are working for Russian construction project. According to our Russian partner, wiring methos for 24V DC instrument such as transmitter, solenoid valve, gas detectors, etc. shall be 3-wire system (+/- and earthing). As far as I know, the 3-wire method is very old Russian practice and it is not valid any more. Therefore we understand that europian style 2-wire system (+/- only) is sufficient for 24V DC instrument wiring. Also as far as we checked, we have never found out such code&standard requirement of "3-wire".

Stay up to Code with the Latest NEC:


2020 NEC & Related Reference & Study Guides
2020 NEC & Related Reference & Study Guides
Pass Your Exam the FIRST TIME with these Exam Prep Combos:
 

>> Master Electrician Exam Prep     >> JourneyMan Electrician Exam Prep
 

Joined: Oct 2000
Posts: 3,671
Likes: 2
Administrator
Member


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Samurai
Samurai
Fl.
Posts: 46
Joined: May 2007
Top Posters(30 Days)
LarryC 3
NORCAL 2
Popular Topics(Views)
291,343 Are you busy
223,836 Re: Forum
209,234 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5