ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Old Fused Panel
 Old Fused Panel

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
1 members (Scott35), 30 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#92949 04/18/05 11:18 PM
Joined: Apr 2005
Posts: 4
I
Itoh Offline OP
Junior Member
We are working for Russian construction project. According to our Russian partner, wiring methos for 24V DC instrument such as transmitter, solenoid valve, gas detectors, etc. shall be 3-wire system (+/- and earthing). As far as I know, the 3-wire method is very old Russian practice and it is not valid any more. Therefore we understand that europian style 2-wire system (+/- only) is sufficient for 24V DC instrument wiring. Also as far as we checked, we have never found out such code&standard requirement of "3-wire".

Horizontal Ad
Joined: Oct 2000
Posts: 3,684
Likes: 4
Administrator
Member


Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,158
Joined: May 2003
Top Posters(30 Days)
BigB 4
Popular Topics(Views)
327,757 Are you busy
252,626 Re: Forum
235,256 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5