ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Prototype production service needed
by carmend12345. 09/24/18 04:40 AM
220/230/240V 60Hz Systems
by gfretwell. 09/23/18 02:50 PM
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 4 guests, and 27 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 3 1 2 3
New Home Estimate #8995
04/12/02 01:29 PM
04/12/02 01:29 PM
A
aldav53  Offline OP
Member
Joined: Aug 2001
Posts: 545
Chandler, AZ USA
I just put in a bid for $4406.00 for a 1155 sq ft 2 bedrm single family home with approx 74 openings, everything electric, a 200a service, all basically standard stuff. Would like to get some approx bid comparisons. What would an approx bid be for you. Am I in the ballpark?
Thanks,


The Golden Rule - "The man with the gold makes the rule"
Work Gear for Electricians and the Trades
Re: New Home Estimate #8996
04/12/02 08:42 PM
04/12/02 08:42 PM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,360
aldav53;
Does this include the service? OH or UG?

Re: New Home Estimate #8997
04/12/02 10:32 PM
04/12/02 10:32 PM
A
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
Underground $3332. Overhead $3682.

Re: New Home Estimate #8998
04/13/02 12:07 AM
04/13/02 12:07 AM
A
aldav53  Offline OP
Member
Joined: Aug 2001
Posts: 545
Chandler, AZ USA
Underground service. Thought I might be a little high in my bid. umm..
Thanks,


The Golden Rule - "The man with the gold makes the rule"
Re: New Home Estimate #8999
04/13/02 10:29 AM
04/13/02 10:29 AM
F
frodo  Offline
Member
Joined: May 2001
Posts: 129
louisville, ky usa
hi, all i can say is WOW! thats almost $4 a sq. foot!

where the heck are you located?

i dont think i have ever heard of $3.85 a sq foot for residential wiring...here in ky that house would go for around $2500 at the most..

hope you get it though..

good luck
-regards

frodo

Re: New Home Estimate #9000
04/13/02 01:28 PM
04/13/02 01:28 PM
A
aldav53  Offline OP
Member
Joined: Aug 2001
Posts: 545
Chandler, AZ USA
I'm in AZ, but may have to shave some off the bid..


The Golden Rule - "The man with the gold makes the rule"
Re: New Home Estimate #9001
04/13/02 03:20 PM
04/13/02 03:20 PM
A
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
Aldav, General contractors don't build by the sq ft and I dont wire by the sq ft. Charge for what you do! Service + 240V openings + 120V openings + tv/ph = price.

Re: New Home Estimate #9002
04/13/02 09:40 PM
04/13/02 09:40 PM
A
aldav53  Offline OP
Member
Joined: Aug 2001
Posts: 545
Chandler, AZ USA
arseegee, ya thats how I bid it plus 25% overhead & profit, maybe I'll cut back on O & P.


The Golden Rule - "The man with the gold makes the rule"
Re: New Home Estimate #9003
04/18/02 10:17 PM
04/18/02 10:17 PM
M
master66  Offline
Member
Joined: Apr 2002
Posts: 257
Masontown, PA, USA
We were recently asked to bid a similar project. We do mostly commercial and industrial work and explained to the customer that we would probably be high.
The job included a lot of recessed lights and ceiling fans in most rooms.
We proposed using CAT 5 instead of CAT 3 for phone wire and RG6 Quad shield for future home networking. A 200A OH SE w/Copper wire in conduit and a basic Leviton Home Networking panel. We bid $7,200.00. Another contractor got the job for just under $4,000.00. I'm sure that he didn't include provisions for home networking but theres still a big spread. I would like to know how anyone makes any money doing homes for this price. How much profit is there? How long does it take? How many men? How much are the men paid? Someone please, please reply.

Re: New Home Estimate #9004
04/18/02 10:42 PM
04/18/02 10:42 PM
A
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
Master66, speed is the key. We can rough in 9000+ sqft in a week. We pulled 6000 ft of 12/2 yesterday before 2pm. Five man crew including myself. I usually keep two crews in two places, three men on rough in and two on trim out. We can knock out a 3 bedroom spec house in one day. That's what it takes to make money in residential. All work is to my uniform standard. Any of my guys can make up a 4 gang box w/ one s.p., two three ways and a four way and I can't tell which guy it was. That way who ever comes back to trim out knows exactly what's going on. Labor runs $10-$14 per man depending on time served. We also install LANs and structured cabling for houses with a Low Voltage distro panel we custom build. It offers a lot more than Leviton or PS and is actually cheaper.

Page 1 of 3 1 2 3

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
cookcc
cookcc
California ,Long Beach
Posts: 28
Joined: May 2007
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 9
Popular Topics(Views)
249,427 Are you busy
187,351 Re: Forum
176,688 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.023s Queries: 15 (0.004s) Memory: 1.0234 MB (Peak: 1.1980 MB) Zlib enabled. Server Time: 2018-09-24 11:59:44 UTC