You know how we always complain about violations, so I saw a job in a very large custom home the other day.
This home is about 7,000-8,000 sq. ft. with 5 car garage, home office, maid's quarters, etc.
The job has been going on for 2 years now. I gave it a 2nd floor rough inspection, then a 1st floor rough inspection.
I haven't even done the basement or the service yet.
The man who is doing the wiring here is very neat in his workmanship.
I have sent you 3 pictures of just how neat his work is.
1. Neat Wiring shows a run of about 10-12 Romex wires running around a curved ceiling. Each wire was laid flat and neat next to each other.
2. Neat Wiring 2 shows how he lays each wire along side each other in a
dropped ceiling area next to a curved doorway.
3. Neat Wiring 3 also shows how he lays out his wiring inside of a domed
ceiling.
Just thought you would like to see these.
Have a Great Holiday.
Caper