ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
New tool
by gfretwell - 10/22/20 12:08 PM
Where is Everyone?
by Bill Addiss - 10/17/20 07:04 PM
Beyond Belief
by gfretwell - 09/27/20 12:03 AM
Questioning the electrical norms
by LongRunner - 09/23/20 06:38 AM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
2 registered members (Scott35, gfretwell), 18 guests, and 4 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Circuit Identification and Purpose Directory #87377 02/24/04 01:37 PM
Joined: Oct 2000
Posts: 2,749
Joe Tedesco Offline OP
Member
Do you make sure that all circuits and circuit modifications are legibly identified as to their purpose or use on a circuit directory that is located on the face or inside of the panel door in the case of a panelboard, and at each switch on a switchboard? 408.4

Do you also make sure 110.22 is complied with as well?


Joe Tedesco, NEC Consultant
2017 / 2014 NEC & Related Books and Study Guides
Re: Circuit Identification and Purpose Directory #87378 02/24/04 09:52 PM
Joined: Apr 2002
Posts: 7,211
HotLine1 Offline
Member
Joe:
Honestly, I have to say 90% on branch circuits that have been 'modified', 100% on new work, and 100% on discos & swbds.

John


John
Re: Circuit Identification and Purpose Directory #87379 02/24/04 10:26 PM
Joined: Oct 2000
Posts: 2,721
Scott35 Online Happy
Broom Pusher and
Member
Yes.

In the lines of HotLine1's message, for a "minor" service type installation, I'll update the directory as to the new circuit(s) installed.

For remodels / T.I.s which result in nearly all circuits being altered, I'll print out a new, clean Directory (with a few extras - 1 blank, 1 with minimal info).

For new installs, definitely print out Directories.

At times, I'll also include a Panel Schedule for use in future load calculations, or to determine what's been designed to the circuitry at the time.
All these items - of course, are custom created databases & spreadsheets - printed from my Home based Workstations.

As to labeling Equipment / Discos / etc., if not subject to weather or "abnormal" physical influences, I'll print out Panel / Circuit information on either 5163 label stock, or using the "Brother P-Touch" label maker.
Where these labels will last 5 days max., I'll "carefully" print Panel / Circuit information using a Permanent Marker or "Paint Pen".

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Re: Circuit Identification and Purpose Directory #87380 02/24/04 10:34 PM
Joined: Feb 2003
Posts: 169
R
russ m Offline
Member
I always make sure that the panel schedule is marked, main disconnects also.

Got to admit on disconnects for other things like machinery, A/C units, pool pumps, or roof top stuff I haven't been requireing it.
Most of this stuff is pretty obvious as far as the disconnect goes.

Re: Circuit Identification and Purpose Directory #87381 02/25/04 04:46 PM
Joined: Dec 2003
Posts: 751
E
earlydean Offline
Member
I heard from another inspector of a guy who wrote all the information in Chinese characters. (He was of Chinese descent) the inspector made him add the English translations.


Earl
Re: Circuit Identification and Purpose Directory #87382 02/25/04 04:57 PM
Joined: Apr 2002
Posts: 7,211
HotLine1 Offline
Member
Earl:
I work PT as an AHJ (2 days), and the Twp has a very diversified ethnic population.

Yes, I had a panel marked in chineese characters, and I requested English sub-titles from the owner/contractor.

I understand that english was not the 'first' language of the occupants, but I cannot read chineese either. Although this subject could be debated at the Board of Appeals, I choose the easy way out and 'requested' the sub-titles.

John


John
Re: Circuit Identification and Purpose Directory #87383 02/25/04 06:05 PM
Joined: Oct 2000
Posts: 2,749
Joe Tedesco Offline OP
Member
Thanks for the many replies: I will bet that NFPA would have a problem with an NEC Proposal that would accommodate the language issue in your areas, can you imagine?

Earl and John: I will be the third submitter if you submit a proposal for the 2008 NEC!

By the way I am in Biloxi, Mississippi at the NEC TCC (Technical Correlating Meeting) and they are reviewing the NEC Comments and Panels Actions --- some interesting issues and information I am absorbing.


Joe Tedesco, NEC Consultant

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
lil suzi
lil suzi
Midwest
Posts: 57
Joined: August 2003
Show All Member Profiles 
Top Posters(30 Days)
BigB 3
Popular Topics(Views)
270,731 Are you busy
204,964 Re: Forum
193,075 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3