ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 376 guests, and 7 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#8348 03/19/02 08:28 PM
Joined: May 2001
Posts: 378
F
frank Offline OP
Member
I have to remove a few pull stations for construction and was wondering if they are as easy to remove as heat sensors.There are two panels an edwards MC 250 and a MC 350 the 350 has pull-stations with evacuation and standard bells.The pull-stations are Edwards SPOW and 30 years.Thanks

#8349 03/25/02 10:46 PM
Joined: Mar 2002
Posts: 125
S
Member
If you don't mind the system going off, they are very easy to do. Once removed( if the system is to remain online) all you have to do is wire nut the wire back accordingly.

#8350 03/26/02 07:54 PM
Joined: Oct 2000
Posts: 5,392
S
Member
?

[This message has been edited by sparky (edited 04-29-2005).]


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5