Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#83050 01/05/03 09:10 PM
Joined: Apr 2001
Posts: 449
F
Fred Offline OP
Member
I have a question concerning "Smart House" wiring. I have a large(8000sqft)custom home started and the customer has decided to install a "Smart House" system that will control lighting, HVAC and security via a computer interface. The customer has contracted a company to install this system. This company has not installed a smart house system before but has an employee who attended schooling for it last summer.
This company is telling me that I should wire all lighting circuits as I normally would but they will provide me with the switches for the lighting that I will wire just as I would a normal 1P, 3-way or 4-way switch. These switches they will provide will have additional terminals for their low voltage wiring which they will terminate. I have a meeting with a rep from this company scheduled for 01/07 and would like to have some input from anyone experienced with smart house systems before then. If anyone has any insight, please share it with me. It sounds a little fishy to me running 24V wire into a metal device box with 120V cable and a device with no dividers.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#83051 01/05/03 11:16 PM
Joined: Oct 2000
Posts: 2,749
Member
Frank:

Review Article 780 Closed-Loop and Programmed Power Distribution


Joe Tedesco, NEC Consultant
#83052 01/05/03 11:24 PM
Joined: Apr 2001
Posts: 449
F
Fred Offline OP
Member
Joe,
I have reviewed the article. Hybrid cable has not been suggested on this job. Just my NM cable and the Smart House contractor's LV wire.
(Please note the name FRED, not FRANK)


Link Copied to Clipboard