ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 390 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#82771 12/11/02 01:17 PM
Joined: Jun 2001
Posts: 21
V
VOLTS Offline OP
Member
Is it ok to have a unclassified area open into an class 1 div 1 that is seperated by a doorway? Should there be an transition area of div 2? 500.5 B (2)3 does not indicate how large the transition area sould be if required.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#82772 12/11/02 05:08 PM
Joined: Oct 2002
Posts: 210
S
Member
Engineers and building officials make the call on that stuff. Contact the AHJ and have them make the call.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5