ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
sec cable code conflict
by jake2018. 11/17/18 11:19 PM
This anti-theist is priceless!!!
by Texas_Ranger. 11/17/18 02:15 PM
High current GFI vs regular GFCI
by Texas_Ranger. 11/17/18 02:07 PM
Single phase and what you call it.
by dsk. 11/12/18 11:10 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 38 guests, and 21 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Just wanted to say hello #8121
03/08/02 02:56 PM
03/08/02 02:56 PM
E
electrician02125  Offline OP
Member
Joined: Feb 2001
Posts: 89
Hello all

I am a maintenance electrician for a State University in Massachusetts.

This website and discussion forum are a great knowledge sharing resource that I visit daily.

Stay safe.

Work Gear for Electricians and the Trades
Re: Just wanted to say hello #8122
03/08/02 03:47 PM
03/08/02 03:47 PM
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
Welcome:

Do you have to follow the NEC and the Massachusetts Electrical Code amendments, and are the electrical installations at your university subject to electrical inspection by an electrical inspector at the state level, or from the local building department?


Joe Tedesco, NEC Consultant
Re: Just wanted to say hello #8123
03/08/02 10:17 PM
03/08/02 10:17 PM
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,903
NY, USA
Hello,

Welcome! we're looking forward to your participation.

[Linked Image]
Bill

Re: Just wanted to say hello #8124
03/09/02 08:47 AM
03/09/02 08:47 AM
E
electrician02125  Offline OP
Member
Joined: Feb 2001
Posts: 89
Niether. I always follow current NEC using MA ammendments. I also frequently use the NFPA, UL, ADA....

Here at the University nothing in-house gets inspected which has always seemed to me to be almost criminal. I spent 5 years in the maintenance electrical shop and about 6 years ago I became responsible for the computer room wiring (power, data, telecom, hvac) for a total of 11 years. I run my own show in the computer room as they realize the importance of their raised floor more and more as the days go by and also realize that the electric shop cannot be trusted to perform work in this critical environment. I've been told that the in house Professional Engineers are responsible for the work they stamp. Does this sound correct ? I never bought it and always wished that inspectors would become part of the process but this would slow everything down in an already sluggish environment.

My biggest frustration was working in the electric shop dealing with guys that have been protected by the state system for so long they have forgotten what goes on in the real world. The best move I ever made was moving over to the computer room side of the house.

I have often raised the question about inspections on in-house work and frequently got the cold shoulder from the electrical supervisor, whom by the way is the worst hack I have ever seen.....but he is protected by the state system. Very frustrating when you start to understand the scope of damage that this guy has allowed to pass as acceptable work. This was why I got out of the shop and moved on to bigger and better opportunities.

By the way, I know that my facility is not the only state buildings not being inspected. There are many others.

Re: Just wanted to say hello #8125
03/10/02 06:33 PM
03/10/02 06:33 PM
T
The Watt Doctor  Offline
Member
Joined: Dec 2001
Posts: 435
Mont Belvieu, TX
Welcome.

Regards,
Doc


The Watt Doctor
Altura Cogen
Channelview, TX

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 7
Popular Topics(Views)
251,560 Are you busy
188,717 Re: Forum
178,434 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.027s Queries: 14 (0.006s) Memory: 0.9690 MB (Peak: 1.1082 MB) Zlib enabled. Server Time: 2018-11-18 10:35:06 UTC