ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 263 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#80866 06/09/02 01:31 PM
Joined: May 2002
Posts: 68
E
Eandrew Offline OP
Member
If a conductor is for a continuous load and feeds the load through a raceway of more than three conductor, do you only apply the fill correction and forget the continuous load aspect. Or do you take them both into consideration?

Work Gear for Electricians and the Trades

Workgear for Electricians

#80867 06/11/02 03:54 PM
Joined: Feb 2002
Posts: 182
B
Bob Offline
Member
You must use the derating for continous
load and conduit fill when derating these conductors.

#80868 06/11/02 05:29 PM
Joined: May 2002
Posts: 68
E
Eandrew Offline OP
Member
Thanks Bob.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5