ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Violation?
by renosteinke - 01/27/23 09:52 PM
Does NEC 551.71 (F) apply to dwellings?
by BigB - 01/20/23 10:46 AM
Power submeter connections
by HotLine1 - 01/19/23 09:09 AM
AFDD's coming to the UK
by Texas_Ranger - 01/17/23 07:22 PM
New in the Gallery:
Burger King crown sillyness
Burger King crown sillyness
by wa2ise, December 11
240/208 to a house
240/208 to a house
by wa2ise, October 9
Who's Online Now
0 members (), 20 guests, and 9 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#79752 01/17/02 11:39 AM
Joined: May 2001
Posts: 129
F
frodo Offline OP
Member
hi,
i am looking at doing three buildings at three different coal mines. the building will b some kingd of lab. just lights and recepts.

i am trying to decide whether to use EMT, ENT, BX, or MC for these buildings..

the area is not classified.

anything else i should consider?

-regards

frodo

Stay up to Code with the Latest NEC:


2020 NEC & Related Reference & Study Guides
2020 NEC & Related Reference & Study Guides
Pass Your Exam the FIRST TIME with these Exam Prep Combos:
 

>> Master Electrician Exam Prep     >> JourneyMan Electrician Exam Prep
 

#79753 01/17/02 05:06 PM
Joined: Jan 2001
Posts: 1,044
Tom Offline
Member
You can forget the BX unless you get the kind with an equipment grounding conductor in it, the Fed's will require this.

I usually use MC for concealed work & EMT (with an equipment ground pulled in) for exposed work.

I'd say forget the ENT, knowing how mine inspectors think, they probably wouldn't care to see it.

For circuits up to #6 AWG, your equipment ground must be sized 100% of the hot conductor, #4 & up it must be at least 50% of the hot conductor. This could be a problem if you tried to run any cable larger than #10, since the equipment ground will be too small.

What state will this be in?

Tom


Few things are harder to put up with than the annoyance of a good example.
#79754 01/17/02 09:19 PM
Joined: May 2001
Posts: 129
F
frodo Offline OP
Member
hi,
thanks for the reply. two of the labs is in southern indiana and the other is in kentucky.

in a drop in cieling then just using flex would be adequate for the light fixtures, and run emt everywhere else?

ent would probably scare even those mine guys!

-regards

frodo

#79755 01/18/02 08:52 PM
Joined: Jan 2001
Posts: 1,044
Tom Offline
Member
Yeah, they understand flex. The biggest thing, as I pointed out, is to have an equipment ground in every raceway.

I'll be doing a Bath House & motor Barn in Mossy, WV, probably next month. The Bath House is portable, being built about 6 miles from where I live & we'll ship it on flatbeds. The motor barn will be built on site.

I've been to Inez, Kentucky a few times, thats about as far from Indianna as you can get & still be in Kentucky.

Toim

[This message has been edited by Tom (edited 01-18-2002).]


Few things are harder to put up with than the annoyance of a good example.

Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC Now Available!
 
* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 187
Joined: November 2005
Top Posters(30 Days)
BigB 8
triple 3
Popular Topics(Views)
302,637 Are you busy
231,939 Re: Forum
216,588 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5