ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Look at this mess...
by InspectorE - 10/27/20 09:09 PM
Unusual Well Pump Switch Failure
by InspectorE - 10/27/20 09:01 PM
New tool
by gfretwell - 10/24/20 11:09 AM
Where is Everyone?
by Bill Addiss - 10/17/20 07:04 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 13 guests, and 14 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Transformer bonding #78900 11/06/01 05:53 PM
Joined: Jul 2001
Posts: 29
T
tmon Offline OP
Member
On a pad mount transformer, how are the bonding jumpers sized that bond the metallic raceways (grounding bushings)within the primary and secondary sections? Thanks, Tom

2017 / 2014 NEC & Related Books and Study Guides
Re: Transformer bonding #78901 11/06/01 11:56 PM
Joined: Jan 2001
Posts: 75
G
Glenn Offline
Member
Tom, suggest 1999 NEC 250-80, 250-102(c), 250-28(d) assuming this is an Utility Co. transformer, other wise 250-30 for secondary side and 250-122 for primary side.



[This message has been edited by Glenn (edited 11-06-2001).]

Re: Transformer bonding #78902 11/07/01 08:14 AM
Joined: Dec 2000
Posts: 4,283
electure Offline
Member
If this is an exclusively utility controlled xfrmr, the NEC isn't applicable per 90-2(b)(5). You would need to get the spec from the serving utility.


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
SafetyWired
SafetyWired
Pa, USA
Posts: 44
Joined: July 2013
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
271,021 Are you busy
205,021 Re: Forum
193,132 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3