ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
This anti-theist is priceless!!!
by djk. 11/14/18 07:19 AM
Single phase and what you call it.
by dsk. 11/12/18 11:10 AM
220/230/240V 60Hz Systems
by Albert. 11/07/18 12:48 AM
Black & Decker Recalls Hammer Drills
by Admin. 11/01/18 07:22 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 9 guests, and 23 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
110-16 and 384-3 or 4 #77641
06/29/01 08:58 PM
06/29/01 08:58 PM
D
doc  Offline OP
Member
Joined: Nov 2000
Posts: 123
Texas
I dont have my book so be kind here if im wrong on articles but 110 deals with clearance issues and 384 says that 25 ft above panels is to contain nothing but electric equipment,now do i understand that if u have a breaker panel or a panel board that u cannot run anything above it unless it is electrical we are running a steel conveyor about 8-10 ft above a 200 amp breaker panel


MAY THE SUN SHINE ON YOUR FACE IN THE MORNING AND YOU AWAKE WITH A SMILE
2017 / 2014 NEC & Related Books and Study Guides
Re: 110-16 and 384-3 or 4 #77642
06/30/01 05:26 AM
06/30/01 05:26 AM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,371
doc;
110-26(f) mentions 384
110-26(f)(1)(a) EX, talks about foreign systems
which is defined in (b), as long as U provide protection from condensation,leaks or breaks your conveyor can stay.

Re: 110-16 and 384-3 or 4 #77643
07/12/01 09:53 PM
07/12/01 09:53 PM
D
doc  Offline OP
Member
Joined: Nov 2000
Posts: 123
Texas
sorry to be so long getting back but sparky would you take another look at these codes one talks about working area and the other is dedicated space and I see nothing about water it says nothing but electrical is allowed above it am i still missing something I have a book by Mike Holt understanding the code and it shows this area to be left open now what am i missing


MAY THE SUN SHINE ON YOUR FACE IN THE MORNING AND YOU AWAKE WITH A SMILE
Re: 110-16 and 384-3 or 4 #77644
07/12/01 09:59 PM
07/12/01 09:59 PM
G
George Corron  Offline
Member
Joined: May 2001
Posts: 717
Lorton, Va USA
Doc,
I don't think you are missing anything. clear space is clear space, NOTHING goes above that panel except electrical equipment. The purpose was for the electrician to always have a path to the panel, conveyors would be in the way, sorry, in my jurisdiction, down it comes.

Re: 110-16 and 384-3 or 4 #77645
07/12/01 11:39 PM
07/12/01 11:39 PM
A
Anonymous
Unregistered

How about if he just suspends a slab of concrete there so the conveyor is on the next floor up in the building?


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Radar
Radar
Los Angeles, CA
Posts: 349
Joined: April 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 8
dsk 3
Popular Topics(Views)
251,431 Are you busy
188,648 Re: Forum
178,353 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.023s Queries: 14 (0.005s) Memory: 0.9657 MB (Peak: 1.1063 MB) Zlib enabled. Server Time: 2018-11-14 15:35:26 UTC