|
0 members (),
32
guests, and
21
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: May 2001
Posts: 552
OP
Member
|
Has anyone else seen this? Reminds me of the deer on the powerlines. { Edited to fix image link }[This message has been edited by pauluk (edited 02-10-2007).]
Donnie
|
|
|
|
Joined: Feb 2003
Posts: 231
Member
|
|
|
|
|
Joined: May 2003
Posts: 2,876
Member
|
Appears they finished the job - took down their pulleys and left the moose to rot itself off the lines.... As it looks to be the same moose in the same location later in the snow season.
Mark Heller "Well - I oughta....." -Jackie Gleason
|
|
|
|
Joined: Jun 2005
Posts: 821
Member
|
Must be cold up there, huh?
|
|
|
|
Joined: Nov 2006
Posts: 26
Member
|
what a waste of a good moose.
|
|
|
|
Joined: Mar 2005
Posts: 1,213
Member
|
I don't think it was wasted- according to that link, the Moose was very tasty!
|
|
|
|
Joined: Jul 2004
Posts: 625
Member
|
It appears to me that this moose was well-hanged. I'll leave it to the ladies to examine the pictures more closely to determine whether or not he was well-hung.
|
|
|
|
Joined: Sep 2001
Posts: 806
Member
|
Bet you he was hung like a moose... ![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif)
|
|
|
|
Joined: Nov 2006
Posts: 26
Member
|
missed the link, sorry. ![[Linked Image]](https://www.electrical-contractor.net/ubb/biggrin.gif) That derned pole just blocks everything. And they STILL don't have my fireman calendar up at the wholesalers. *steamed* ![[Linked Image]](https://www.electrical-contractor.net/ubb/rolleyes.gif)
|
|
|
Posts: 240
Joined: March 2005
|
|
|
|
|