ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 703 guests, and 46 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#6544 01/05/02 01:10 PM
Joined: Dec 2001
Posts: 270
E
Elzappr Offline OP
Member
Design-build has been a great way to speed up a construction project, and also quite an initial cost saving to the owner because of the "value engineering". My concern is about the long term cost. For example: Regular engineered jobs for commercial buildings frequently design a 20A illumination circuit with just 8A initial installed load. The jobs where the electrical contractor draftsmen/electrician/estimator design the illumination circuits commonly run about 14A initial installed load. As a result, the initial cost is driven down because you don't have as many circuits to deal with..but think of the expensive headaches down the line when remodeling is done and there isn't sufficient capacity or flexibility! I'm of the opinion that design-build by non-engineering staff among electrical contractors is moreoften short-sighted and not in the best interest of the building owners.
My question is primarily directed towards the engineers out there: What criteria do you use in your designs that you don't see applied by the electrical contractors? I'm thinking that there must be some laundry list of complaints against the quick-fix mentality and the long-term utility concerns of the professional engineer.

[This message has been edited by Elzappr (edited 01-05-2002).]

Horizontal Ad
#6545 01/05/02 03:39 PM
Joined: Oct 2000
Posts: 5,393
S
Member
Elzappr;
Most tradesmen being exposed to engineered documents will find your Q self explanatary.


Link Copied to Clipboard
Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Advertisement:-Right
Member Spotlight
JoeKP
JoeKP
Berkley, MA
Posts: 144
Joined: March 2008
Top Posters(30 Days)
Popular Topics(Views)
558,663 Are you busy
432,946 Re: Forum
401,943 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5