ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Israel
by Texas_Ranger. 01/14/19 07:12 AM
Free Code class in Maryland 1/16/2019
by Admin. 01/12/19 05:43 PM
Calling all Non-US members!! (Non-US only)
by RODALCO. 01/12/19 02:37 AM
sec cable code conflict
by jake2018. 01/11/19 07:36 PM
Residential Smoke wiring
by gfretwell. 01/11/19 12:36 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 11 guests, and 17 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
demand and connected load #5753
12/05/01 02:52 PM
12/05/01 02:52 PM
S
sparky02  Offline OP
Junior Member
Joined: Dec 2001
Posts: 1
columbus, ohio
how do i determine the demand load of a building i.e. a school has a connected load of 299 amps what is the demand load? also does anyone know the maximum open circuit voltage on a dwelling unit? im using a study guide for the contractors exam and the approved reference materias do notseem to have this info in them.

Work Gear for Electricians and the Trades
Re: demand and connected load #5754
12/05/01 04:50 PM
12/05/01 04:50 PM
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
See Section 220-34 and Table 220-34 and Section 210-6(a)in the 1999 NEC.
See also Section 410-80(b).

[This message has been edited by Joe Tedesco (edited 12-05-2001).]


Joe Tedesco, NEC Consultant

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,150
Joined: May 2003
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 4
BigB 3
Popular Topics(Views)
252,719 Are you busy
189,560 Re: Forum
179,232 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.019s Queries: 14 (0.004s) Memory: 0.9421 MB (Peak: 1.0589 MB) Zlib enabled. Server Time: 2019-01-17 17:36:41 UTC