ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Updated Forum Software
by Admin - 06/15/21 10:23 AM
Broken Outlet & Dangling Light
by LoneWolf - 06/14/21 08:21 PM
How's all our Non-US folks doing?
by C-H - 06/14/21 05:42 PM
Where is Everyone?
by Bill Addiss - 06/14/21 12:37 PM
Conduit over Vinyl Siding
by Bill Addiss - 06/14/21 12:35 PM
New in the Gallery:
2020 - 2021 Winter Project
2020 - 2021 Winter Project
by Bill Addiss, April 29
Garden 2021
Garden 2021
by Bill Addiss, April 26
Who's Online Now
1 members (Scott35), 12 guests, and 17 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#52961 06/14/05 05:22 PM
Joined: Nov 2000
Posts: 246
R
rmiell Offline OP
Member
A local manufacturing plant is fed with our power supply. There is a second supply from a seperate source (100amp, 120/240 single phase) that feeds a breaker panel which in turn feeds light fixtures situated thru-out the plant. Under normal conditions, all of these lights are non-energized. When our power supply is lost, a lighting contactor pulls in, and these circuits are energized. This is supposed to allow personal to move around in the plant, and exit if desired.

We want to remove this 2nd power supply (from another supplier), and instead feed this panel using another means, such as a ups, or some such thing. Of course this ups will not be used except when normal power is lost.

The actual load is under 50amps.

Anybody have any ideas on a vender who has just a battery backup, much like a ups, but without the power conditioning etc. that a ups provides.

Thanks in advance

Rick Miell

#52962 06/14/05 05:32 PM
Joined: Jan 2003
Posts: 4,391
I
Moderator
Rick are the circuits in question really emergency circuits covered by Article 700 or are they entirely optional and covered by Article 702?

If it is Article 700, check out 700.12(C)

All you would need is an inverter / charger system. I suggest an on-line search.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#52963 06/14/05 07:00 PM
Joined: May 2001
Posts: 376
F
Member
after the legalities have been fully explored like iwire said check here http://www.powermanagementsystems.com/

and here for many more http://www.google.ca/search?hl=en&q=lighting+ups&meta=

Found this as well http://www.controlledpwr.com/

I would get a rep from your local wholesaler and see who they deal with for ease of part avalibility/warranty should something fail down the road.How long of a battery back up do you need?
We recentaly installed 58 exit lights with built in emergency lighting at exits (3hr backup)to replace an old ups that failed and left the building without any lights.Depends on the building layout if this is feasable or not.Good luck



[This message has been edited by frank (edited 06-14-2005).]

#52964 06/14/05 09:17 PM
Joined: Jul 2004
Posts: 625
S
Member
Here are a couple more suppliers of inverter/chargers:
http://www.outbackpower.com
http://www.xantrex.com

I don't know how close a match they might be to what you're trying to do; their primary focus is alternative energy systems. But, they're in about the right power range for what you want to do.


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Niko
Niko
Campbell, CA
Posts: 356
Joined: August 2006
Top Posters(30 Days)
Admin 14
Trumpy 10
Popular Topics(Views)
280,390 Are you busy
213,461 Re: Forum
200,378 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5