ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
From an outsider- How does tipping work?
by gfretwell - 12/02/20 02:38 PM
Happy Thanksgiving
by Trumpy - 12/02/20 04:11 AM
Where is Everyone?
by Trumpy - 12/02/20 03:51 AM
What does your work place look like?
by Trumpy - 12/02/20 03:42 AM
Ground fault remover :-)
by dsk - 11/30/20 03:51 AM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 23 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Plenum rated Romex #46693 12/30/04 10:50 PM
Joined: Jul 2004
Posts: 129
H
hypress Offline OP
Member
Was talking with a friend of mine today and we were wondering why someone has not developed a plenum rated Romex. If they can do it for low voltage why not high voltage?
HYPRESS

Work Gear for Electricians and the Trades
Re: Plenum rated Romex #46694 12/30/04 11:21 PM
Joined: Dec 2003
Posts: 886
H
hbiss Offline
Member
I would say because you can't use romex above a hung ceiling in commercial jobs. What would the demand for it be?

OR are you saying that a plenum rated romex would change all that and COULD be used in air handling spaces above a hung ceiling?

-Hal

Re: Plenum rated Romex #46695 12/30/04 11:47 PM
Joined: Jul 2004
Posts: 129
H
hypress Offline OP
Member
Plenum rated romex could be used above a ceiling and above the 3rd floor in a structure

Re: Plenum rated Romex #46696 12/31/04 12:08 AM
Joined: Apr 2002
Posts: 2,527
B
Bjarney Offline
Moderator
This groovy “new-tech” NM-B seems to hint at a future plenum-rated cable. In the second link, mention is made of compressed stranding, but it’s not clear if 14-10 are solid or stranded. [I hate solid conductors but have rarely touched NM-B.]
www.mysouthwire.com/Southwire/cda/content/article/0,1443,0_1813,00.html www.mysouthwire.com/Southwire/cda/refdocs/Markets/Residential_Technical/simpull%20sales%20sheet.pdf

[If I had to wire a house at gunpoint, I’d want FREP tray cable to do it, and regularly take the inspector out for a lot of drinking—but not before 1:30. Some work has to at least look like it’s progressing.]

Re: Plenum rated Romex #46697 12/31/04 02:25 AM
Joined: Dec 2003
Posts: 886
H
hbiss Offline
Member
Don't see how that hints at a possible plenum rated cable at all.

There is a lot of politics here, that's why you will never see it. The same reason you can't use tray cable in place of NM even though it exceeds NM specs in every way.

-Hal

Re: Plenum rated Romex #46698 12/31/04 09:03 AM
Joined: Apr 2004
Posts: 201
CharlieE Offline
Member
Quote
There is a lot of politics here, that's why you will never see it.
No kidding, the steel tube people do not want NM cable use to be expanded. Also, the plastics people (mostly Carlon) do not want NM use expanded. Between them, they carry a lot of weight on the Code Making Panel. [Linked Image]

- - - - - - - - - - - - - - - - - - - - - - - - - - -
Charlie Eldridge, Indianapolis, Utility Power Guy


Charlie Eldridge, Indianapolis Utility Power Guy

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Potseal
Potseal
Saskatchewan
Posts: 264
Joined: February 2013
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 20
Popular Topics(Views)
272,206 Are you busy
206,091 Re: Forum
194,097 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3