Filling out permit applications, and entering the same information, on form, then folder, and at times also the construction form, Now we really don't need to enter all that information more then once, can someone simplify the permit application and process, it dosen't look like rocket science.
|
|
|
|
Joined: Aug 2001
Posts: 151
Member
|
Low voltage alarm/phone/data etc. cables spider-webbed across the ceiling void above suspended ceilings, in every which direction, draped from conduit to duct, pulled tight as a guitar string, or just laid across the tiles and grid.
Always tightest right over the only tile accessible in a five tile radius. Sheesh.
What were we talking about?
|
|
|
|
Joined: Aug 2001
Posts: 151
Member
|
Low voltage alarm/phone/data etc. cables spider-webbed across the ceiling void above suspended ceilings, in every which direction, draped from conduit to duct, pulled tight as a guitar string, or just laid across the tiles and grid.
Always tightest right over the only tile accessible in a five tile radius. Sheesh.
What were we talking about?
|
|
|
|
Joined: Oct 2001
Posts: 172
Member
|
People that double post! Just kidding Dallas, I couldn't resist.
|
|
|
|
Joined: Dec 2002
Posts: 308
Member
|
Not long enough conductor in the box to work with and two much romex jacket in the box.
I only have 1/4 inch romex cable jackets in the box maybe.maybe 3/8 That is it.
Edward
Thanks Edward
|
|
|
|
Joined: Apr 2002
Posts: 7,382 Likes: 7
Member
|
Les: Top of the evening, my friend. Yes, you are 100% right, info written at least 3 times, on different forms, name, address, phone, block-lot, etc.
Good thing we are a part of the "paperless society" HA!
OK, you fill it out 3 times, I read it, initial/date & ck a box; then do the same on the folder, then write it ALL down on a log sheet, then enter the approval in the PC, then give it to others (Fire/Bldg/Plumb) and then it goes to the "girls" who write/log/data enter & call the responsible person. NOW, after as many inspections as it takes, more writing, logs & PC entries, it all goes back to the 'girls' for a CO/CA (More forms)
Top it off with a plan review problem, generating aphone call or five, more writing, or a notice of non-compliance.
A lot of the guys here do not know the "paper" NJ system. How about the guys in LA??? Permits over the internet!! Saw it in ECN Mag this week
Happy Holidays & Be Safe
John
John
|
|
|
|
Joined: Feb 2002
Posts: 840
Member
|
On of my all time pet peeves is when professional lektrishuns refer to receptacles as "plugs."
Peter
|
|
|
|
Joined: Nov 2002
Posts: 244
Member
|
It would have to be ... A customer who is or resembles a snobish housewive with no construction knowledge and has a demanding desire for a huge castle for little or no money. Or would it be that supply house guy that puts the wrong stuff in the box? Hmmm
|
|
|
|
Joined: Nov 2003
Posts: 127
Member
|
DIY (or is it DYI- Do Yourself In) websites that give poor and sometimes outright dangerous advice. Finding that someone used the device terminals to rely on multiwire (Edison) circuit neutral integrity. Cable found in metal boxes without clamp(s) to hold it (them) secure. Surveyors who think they know something about electr... oops, I'd better shut up .
No wire bias here- I'm standing on neutral ground.
|
|
|
|
Joined: Jun 2004
Posts: 32
Member
|
Tobacco chewing/dipping slobs that seem to go out of their way to spit a glob on my material or right where I need to work!! KB
|
|
|