ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
2 circuit track lighting all of a sudden cross con
by gfretwell - 11/18/19 11:55 PM
Look at this mess...
by NORCAL - 11/15/19 10:21 PM
Fire source!
by sabrown - 11/07/19 08:39 AM
Parallel Conductor Divisor
by LongRunner - 11/04/19 02:21 AM
FPE in Germany
by Texas_Ranger - 10/29/19 05:12 AM
New in the Gallery:
FPE Breaker panel in germany
What is this for?
Who's Online Now
1 registered members (ComputerWizKid), 10 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
ATTENTION Megawatt #45293 11/22/04 05:34 PM
Joined: Nov 2004
Posts: 56
D
detubbs Offline OP
Member
"I have the National Electrical Estimator, & it is fairly easy to use, & resonably priced...it allows you to change any of the prices, & has the ability to enter mark-up for different catagories.
Comes with a CD & a paperback book.
I've found their labor estimates (for time required) to be very close, & their material prices seem to be a little higher than I find here in Kentucky."

Where did you get this program? what was the cost? does it have "everything" as far as materials or do ya hafta fudge everynow and then? i saw that in accubid (3000$+), when you select "conduit" it takes into account for couplers/screw/hangers/etc. for every stick. i've been using a free sample of "BidforBuild" to try and get a rough labor idea.


Scott
Work Gear for Electricians and the Trades
Re: ATTENTION Megawatt #45294 11/22/04 08:46 PM
Joined: Feb 2004
Posts: 133
E
Electric Ian Offline
Member
http://www.craftsman book.com/products/info/ne5.htm

Re: ATTENTION Megawatt #45295 11/22/04 09:00 PM
Joined: Nov 2004
Posts: 56
D
detubbs Offline OP
Member
thanks IAN! have you experianced this program? do you know how big of jobs you can estimate with it?


Scott
Re: ATTENTION Megawatt #45296 11/23/04 08:01 PM
Joined: Feb 2004
Posts: 133
E
Electric Ian Offline
Member
I have used it a few times but for fairly small jobs so I really couldn't say for sure what it's limitations are. I would think however that it can be used for large jobs as the program basically allows you to create a list of material to be used for a job and assigns a cost for the material and associates a quantity of time to each unit of material. For example, say you are going to install 120 feet of EMT, it would assign the cost of the EMT at say $6/unit (1 unit = 10 ft length) and say 1 hour labor per unit for installation. You can set the hourly rate so say you have it set for $50/hr. In this example the estimate would be (12units*$6/unit=$96 for material) + (12units* 1hr/unit*$50/hr=$600 for labor)= Total Estimate for material + Labor = $696. I've made up the numbers here but you hopefully this gives you the general idea of how it works.

Re: ATTENTION Megawatt #45297 11/23/04 08:09 PM
Joined: Feb 2004
Posts: 133
E
Electric Ian Offline
Member
Oh, I think I left a dash "-" out of the link above. Try this instead
http://www.craftsman-book.com/products/info/ne5.htm


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,281
Joined: December 2000
Show All Member Profiles 
Top Posters(30 Days)
BigB 5
Popular Topics(Views)
260,718 Are you busy
195,752 Re: Forum
185,139 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3