HI, SORRY FOR THE TITLE BUT MUST BE USE INSTEAD OF SUE AND I DID NOT HAVE A WAY TO EDIT, WELL , I AM IN PLEASANT HILL, CA 945423 AND I ALWAYS INSTALL THE FEED WIRES FROM THE ELECTRIC UTILITY SUPPLIER THROUGH A RIDGID CONDUIT PIPE OF 2 INCES WITH A 200 AMPS . BUT I FOUND IN A HOUSE OF A FRIEND THAT AN ELECTRICIAN JUST PUT THIS FEED WIRES WITH A SCHEDULE 40 PLASTIC PIPE . THIS IS A PROVISIONAL POWER WHILE THE HOUSE IS ON CONSTRUCTION BUT I AM NOT SURE IF HE CAN DO THAT BECAUSE IF A TRUCK OR CONCRETE TRUCK OR WHATEVER HITS THE POLE , WOULD BE A BIG DEAL, LET ME KNOW THANKS
LUIS SILVA SANTISTEBAN
(Company Name and Contact info removed)
[This message has been edited by Webmaster (edited 09-26-2004).]
LUIS SILVA SANTISTEBAN CALIFORNIA GENERAL BUILDING AND ELECTRICAL CONTRACTOR 770370 HIC MEMBER OF BETTER BUSINESS BUREAU 925 705 0856
|
|
|
|
Joined: Jul 2004
Posts: 625
Member
|
You can pretty much sue anybody you want to. Whether you can prevail at trial in another question altogether.
|
|
|
|
Joined: Apr 2002
Posts: 2,527
Moderator
|
If this is a temporary electric service, typcially the serving utility {PG&E?} will specify minimum overhead service-riser and underground service-lateral requirements—as long as code minimums {possibly with local amendments} are met. I believe that non-metallic raceway for the application has been generally recognized acceptable in your region for a could of decades. You may find applicable drawings and specs at www.pge.com
|
|
|
|
Joined: Mar 2004
Posts: 98
Member
|
Arround here if it has to do with utility,you go by there requirements.We have PGE,PPL & Salem Electric.Each There requirements alot of the time are different.Especially with the rednecks at Pacific Power.
|
|
|
|
Joined: Apr 2002
Posts: 558
Member
|
If this is an overhead PG&E service, non-metallic conduit is the preferred method. If you use metal conduit you are required to cover it with plastic U-channel or 1 ½” thick wood. If this is an underground service rigid metal conduit or sch 80 PVC is required. Customer Owned Pole Requirements
Curt Swartz
|
|
|
|
Joined: Sep 2004
Posts: 4
OP
Junior Member
|
Thanks for the reply, and especially to caselec for the information, other guys, i appreciate your interes and help Good luck Luis