ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
What does your work place look like?
by HotLine1 - 11/23/20 03:35 PM
Where is Everyone?
by Lostazhell - 11/21/20 04:17 AM
Ground fault remover :-)
by dsk - 11/21/20 02:47 AM
Work Gloves?
by gfretwell - 11/20/20 10:17 PM
Reverse-feeding transformer in PV system?
by winnie - 11/19/20 06:49 AM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
1 registered members (HotLine1), 18 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Wiremold and article 362 question #38592 05/26/04 05:54 PM
Joined: Feb 2004
Posts: 115
H
Haligan Offline OP
Member
I'm struggling to apply the 362 rules to metallic wireways. In this case wiremold v500. I have a job with different circumstances than usual.

Line originates from j-box in attic and enters ceiling of closet. It then goes along the back of a central SOLID square divider that separates the two doorways of the closet. It then passes through the divider into a surface mount single gang device box for toggle sw.

What NEC says:
362-9 Wireways are permitted to pass through walls if the length is unbroken.

Where I'm stuck:
1) Which Wiremold part handles the transition from the attic, through the ceiling and connects to the raceway?
If it's 12/2 NM in the attic, when does it become 3 individual conductors through the raceway, i.e., where is the plastic covering removed?

2) The transition through the wall according to 362-9 must be continuous raceway through wall? If so, I'm thinking either a "Flexible Section v5700f" or two "external elbows".

My other option is to pull the mouldings and gyp-rock from the back of that central post, router a channel up to the ceiling, run the NM through and up to the attic, and cover the channel with steel plates.

Work Gear for Electricians and the Trades
Re: Wiremold and article 362 question #38593 05/27/04 12:11 PM
Joined: Dec 2003
Posts: 886
H
hbiss Offline
Member
Well, without looking in the Wiremold catalog for specific fittings I would run the raceway down the wall (divider) with a "mouse" at either end. A "mouse" transitions from the raceway to a NM connector and will have 1/2"KO's. Install the top one right up against the ceiling with the NM entering it from above.

At the switch box location (or rather behind) use another "mouse" with a short nipple to go through the wall into the back of a cut- in box. You would strip your jacket from the NM after the connector at the top as usual.

Keep in mind that you can use this same basic setup to sleeve the NM. Then you don't need the connector, nipple and probably not even the mice. Just pop the wiremold up through the ceiling. Slide your NM through the wiremold and through a hole in the wall into a connector on the back of your cut-in box. Behind the box use a cut off outside 90 to cover the end and the cable.

-Hal

Re: Wiremold and article 362 question #38594 05/27/04 02:09 PM
Joined: Feb 2004
Posts: 115
H
Haligan Offline OP
Member
Thanks!

The thing that wiremold calls a "combination connector" fits the description of your mouse.

Question- About the 1/2" KO at the top. It seems like I'll have to cut a small 1" hole in the ceiling for the NM connector to fit in there. The tightening screws on the NM clamp stick out a bit.

What type of nipple are you suggesting? EMT or a short length of the wiremold?

I think I understand except for those two details.

- Halligan

Re: Wiremold and article 362 question #38595 05/27/04 03:16 PM
Joined: Dec 2003
Posts: 886
H
hbiss Offline
Member
EMT would work with two connectors. No, you won't be able to run a piece of Wiremold through the wall to the box. I forgot that you are using a surface box, you will have a little more room to work with then. You would enter through a rear KO. You can also use a rigid threaded nipple and 4 locknuts if you can find one of the proper length.

I would consider just sleeving the NM though, much easier and looks better.

-Hal

Re: Wiremold and article 362 question #38596 05/27/04 03:37 PM
Joined: Feb 2004
Posts: 115
H
Haligan Offline OP
Member
Makes sense.
From my interpretation of the code, having the NM run through the divider is okay if it is clamped on both ends as you suggested.

That should do it.
Thanks again.

Re: Wiremold and article 362 question #38597 05/27/04 06:05 PM
Joined: Dec 2003
Posts: 886
H
hbiss Offline
Member
Wouldn't have to be clamped at the top where it enters the raceway, only where it enters the box. You don't strip the jacket off the NM inside the raceway, only as usual at the box so ther is no need to use a connector where it enters the Wiremold. The Wiremold only sleeves the NM. You can do the same thing with EMT instead of Wiremold if the appearance is not an issue.

-Hal

Re: Wiremold and article 362 question #38598 05/27/04 06:53 PM
Joined: Feb 2004
Posts: 115
H
Haligan Offline OP
Member
Got it now.

Thanks for hanging in there with me.


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 9
Popular Topics(Views)
271,880 Are you busy
205,739 Re: Forum
193,850 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3