ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Fuse blower plug?
by HotLine1 - 08/20/19 01:50 PM
100 year old Light Bulb
by HotLine1 - 08/20/19 01:26 PM
Forum Updates Coming Soon.
by Admin - 08/18/19 01:55 PM
Anybody Remember this?
by Bill Addiss - 08/17/19 09:07 PM
1897 paper on 110-220 incandescent lamps
by ghost307 - 08/15/19 10:31 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 5 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Confusion with 250.90 (2011) #216940 03/16/16 11:40 AM
Joined: Mar 2004
Posts: 742
B
BigB Offline OP
Member
250.92(B) says bonding jumpers....shall be used around impaired connections..... and in the same paragraph goes on to say that standard lock nuts or bushings shall not be the only means for the bonding required by this section. I thought the second sentence referred back to the first sentence where jumpers are required around impaired connections. An associate says no, the second sentence refers to all connections on the utility side of the service whether impaired or not.

Further confusion arises in 250.92(B)(3) where it allows threadless connectors made up wrench tight. What is the difference if a threadless connector is used with a standard lock nut versus a threaded piece of RMC using standard lock nuts?

Last edited by BigB; 03/16/16 11:41 AM.
2017 / 2014 NEC & Related Books and Study Guides
Re: Confusion with 250.90 (2011) [Re: BigB] #216944 03/18/16 10:41 AM
Joined: Apr 2002
Posts: 7,105
HotLine1 Offline
Member
BigB:

Utility requirements may be 'above and beyond' NEC rules.


John
Re: Confusion with 250.90 (2011) [Re: HotLine1] #216951 03/19/16 12:00 AM
Joined: Mar 2004
Posts: 742
B
BigB Offline OP
Member
Originally Posted by HotLine1
BigB:

Utility requirements may be 'above and beyond' NEC rules.


Not our POCO. The only thing they are concerned with is their ability to access the meter for non-payment lockout and that their side is locked and sealed.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
GeneSF 8
Popular Topics(Views)
257,886 Are you busy
193,622 Re: Forum
183,239 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3