ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
What do you do?
by gfretwell. 09/18/17 08:17 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
Linear Power Supply Quits Under Load
by JoeTestingEngr. 09/15/17 11:37 PM
Recreational Trailer Power Supply
by David1. 09/14/17 01:55 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,825 Are you busy
176,587 Re: Forum
168,508 Need opinion
Who's Online Now
0 registered members (), 55 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#216940 - 03/16/16 11:40 AM Confusion with 250.90 (2011)  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
250.92(B) says bonding jumpers....shall be used around impaired connections..... and in the same paragraph goes on to say that standard lock nuts or bushings shall not be the only means for the bonding required by this section. I thought the second sentence referred back to the first sentence where jumpers are required around impaired connections. An associate says no, the second sentence refers to all connections on the utility side of the service whether impaired or not.

Further confusion arises in 250.92(B)(3) where it allows threadless connectors made up wrench tight. What is the difference if a threadless connector is used with a standard lock nut versus a threaded piece of RMC using standard lock nuts?

Last edited by BigB; 03/16/16 11:41 AM.

2017 / 2014 NEC & Related Books and Study Guides

#216944 - 03/18/16 10:41 AM Re: Confusion with 250.90 (2011) [Re: BigB]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,862
Brick, NJ USA
BigB:

Utility requirements may be 'above and beyond' NEC rules.


John

#216951 - 03/19/16 12:00 AM Re: Confusion with 250.90 (2011) [Re: HotLine1]  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
Originally Posted by HotLine1
BigB:

Utility requirements may be 'above and beyond' NEC rules.


Not our POCO. The only thing they are concerned with is their ability to access the meter for non-payment lockout and that their side is locked and sealed.



Member Spotlight
Tom
Tom
Shinnston, WV USA
Posts: 1,044
Joined: January 2001
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.028s Queries: 15 (0.016s) Memory: 0.7530 MB (Peak: 0.8771 MB) Zlib enabled. Server Time: 2017-09-20 12:51:01 UTC