ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,229 Are you busy
174,628 Re: Forum
167,057 Need opinion
Who's Online Now
0 registered members (), 51 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#216940 - 03/16/16 11:40 AM Confusion with 250.90 (2011)  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
250.92(B) says bonding jumpers....shall be used around impaired connections..... and in the same paragraph goes on to say that standard lock nuts or bushings shall not be the only means for the bonding required by this section. I thought the second sentence referred back to the first sentence where jumpers are required around impaired connections. An associate says no, the second sentence refers to all connections on the utility side of the service whether impaired or not.

Further confusion arises in 250.92(B)(3) where it allows threadless connectors made up wrench tight. What is the difference if a threadless connector is used with a standard lock nut versus a threaded piece of RMC using standard lock nuts?

Last edited by BigB; 03/16/16 11:41 AM.

2017 / 2014 NEC & Related Books and Study Guides

#216944 - 03/18/16 10:41 AM Re: Confusion with 250.90 (2011) [Re: BigB]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,853
Brick, NJ USA
BigB:

Utility requirements may be 'above and beyond' NEC rules.


John

#216951 - 03/19/16 12:00 AM Re: Confusion with 250.90 (2011) [Re: HotLine1]  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
Originally Posted by HotLine1
BigB:

Utility requirements may be 'above and beyond' NEC rules.


Not our POCO. The only thing they are concerned with is their ability to access the meter for non-payment lockout and that their side is locked and sealed.



Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.025s Queries: 15 (0.003s) Memory: 0.7528 MB (Peak: 0.8769 MB) Zlib enabled. Server Time: 2017-07-23 08:51:19 UTC