ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,229 Are you busy
174,628 Re: Forum
167,057 Need opinion
Who's Online Now
0 registered members (), 51 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#215719 - 07/07/15 10:37 AM 680.22(B)(1) and post lamps  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
For the purposes of 680.22(B)(1) is the post considered as part of the luminaire? (2011 NEC)

Last edited by BigB; 07/07/15 10:37 AM.

2017 / 2014 NEC & Related Books and Study Guides

#215721 - 07/07/15 10:59 AM Re: 680.22(B)(1) and post lamps [Re: BigB]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,853
Brick, NJ USA
IMHO, the 'post' is the support for the luminaire. The post height must place the luminaire at 12' above water.

The few that I have come upon used fiberglass/composite poles at 14', and on GFI circuit.

You should check with your local AHJ for his opinion.


John

#215723 - 07/07/15 01:13 PM Re: 680.22(B)(1) and post lamps [Re: BigB]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,099
Estero,Fl,usa
I agree with John on this. The post is just a support for the luminaire. If it is metal it needs to be part of the bonding grid too.


Greg Fretwell

#215726 - 07/07/15 02:28 PM Re: 680.22(B)(1) and post lamps [Re: BigB]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,853
Brick, NJ USA
Thanks Greg, I omitted the bonding on metallic posts.

Squeezing in posts between hectic times in the office.


John

#215742 - 07/12/15 02:06 AM Re: 680.22(B)(1) and post lamps [Re: BigB]  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
We ended up moving one the lights. The original plans showed that we would have had over 5 feet but when the pool got dug and laid out somehow there was a foot missing, not our fault. They are post lamps mounted on top of a retaining wall so moving one was a lot of fun carving up the concrete blocks.



Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.015s Queries: 15 (0.004s) Memory: 0.7689 MB (Peak: 0.9083 MB) Zlib enabled. Server Time: 2017-07-23 08:53:15 UTC