ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Split Bus Breaker Panel
by gfretwell - 01/28/21 01:00 AM
electircal ageing test on IPC
by quickspark - 01/27/21 08:22 AM
What Does a Ground Rod Do?
by quickspark - 01/26/21 12:38 AM
Floating Ground - device being tested or scope?
by quickspark - 01/26/21 12:36 AM
Ground fault remover :-)
by dsk - 01/24/21 04:35 AM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 19 guests, and 17 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Automating mutiple independently controlled motors #214494 12/15/14 09:52 PM
Joined: Jul 2007
Posts: 1,335
S
sparkyinak Offline OP
Member
Here is a scenario. You have an older building that has multiple HVAC systems, fans, etc., throughout the building. Each sub system operates independently of one another. One day, the powers that be wants to integrate all these independent systems and control them with a central controller. All these fans and motors are various sizes and voltages running off of separate panels throughout the building.

Question: Does the control signal from the new control panel have to control the existing run circuits at each existing starter or can the existing motor and fan control circuits be looped through the new control panel?

I think the control panel must supply the coil power to the relay coils because by looping the control circuit through the control panel will leave multiple "hot" wires in the control panel even when the control panel is powered off presuming each existing motor starter has its own power source. At the same time a lighting control panel can have multiple circuits feeding the contactor from several panels and have the same issues of multiple "hot" wires in a control panel that is off.

By looping the existing run circuits to the new panel would eliminate the cost of retrofitting all the starters in the building to be compatible to the new control panel but I can not find a reference anywhere this either option is right or wrong.

Thoughts?


"Live Awesome!" - Kevin Carosa
Work Gear for Electricians and the Trades
Re: Automating mutiple independently controlled motors [Re: sparkyinak] #214495 12/15/14 11:00 PM
Joined: Jun 2004
Posts: 1,273
T
Tesla Offline
Member
http://www.kmccontrols.com/products/Understanding_Building_Automation_and_Control_Systems.aspx

I don't work that end of the street, but I bet that the big players have already addressed what constitutes optimal design.

http://www.buildingtechnologies.sie...on/pages/building-automation-system.aspx

I believe that Honeywell is a major player.

http://buildingcontrols.honeywell.com/Building-Automation-Systems

This kind of design issue is exactly the type I throw to the specialists.

I'm simply not effective working well away from what I know.


Tesla

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
cookcc
cookcc
California ,Long Beach
Posts: 28
Joined: May 2007
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 18
NORCAL 10
Popular Topics(Views)
274,325 Are you busy
208,178 Re: Forum
195,756 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3