ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Any women electricians here?
by gfretwell - 01/17/22 01:44 PM
12 Lead Motor Connection Weird
by Elektrik - 01/12/22 11:09 PM
Well There's your problem.
by gfretwell - 01/08/22 12:17 AM
Happy New Year!!
by HotLine1 - 01/04/22 09:50 AM
Sangamo s309.2
by Robski - 12/31/21 04:54 PM
New in the Gallery:
240/208 to a house
240/208 to a house
by wa2ise, October 9
Now you know.
Now you know.
by Tom_Horne, September 7
Who's Online Now
0 members (), 51 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Jul 2007
Posts: 1,335
S
Member
Here is a scenario. You have an older building that has multiple HVAC systems, fans, etc., throughout the building. Each sub system operates independently of one another. One day, the powers that be wants to integrate all these independent systems and control them with a central controller. All these fans and motors are various sizes and voltages running off of separate panels throughout the building.

Question: Does the control signal from the new control panel have to control the existing run circuits at each existing starter or can the existing motor and fan control circuits be looped through the new control panel?

I think the control panel must supply the coil power to the relay coils because by looping the control circuit through the control panel will leave multiple "hot" wires in the control panel even when the control panel is powered off presuming each existing motor starter has its own power source. At the same time a lighting control panel can have multiple circuits feeding the contactor from several panels and have the same issues of multiple "hot" wires in a control panel that is off.

By looping the existing run circuits to the new panel would eliminate the cost of retrofitting all the starters in the building to be compatible to the new control panel but I can not find a reference anywhere this either option is right or wrong.

Thoughts?


"Live Awesome!" - Kevin Carosa
Joined: Jun 2004
Posts: 1,273
T
Member
http://www.kmccontrols.com/products/Understanding_Building_Automation_and_Control_Systems.aspx

I don't work that end of the street, but I bet that the big players have already addressed what constitutes optimal design.

http://www.buildingtechnologies.sie...on/pages/building-automation-system.aspx

I believe that Honeywell is a major player.

http://buildingcontrols.honeywell.com/Building-Automation-Systems

This kind of design issue is exactly the type I throw to the specialists.

I'm simply not effective working well away from what I know.


Tesla

Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Theelectrikid
Theelectrikid
Levittown, PA
Posts: 811
Joined: April 2004
Top Posters(30 Days)
NORCAL 3
grich 1
Popular Topics(Views)
287,879 Are you busy
220,049 Re: Forum
206,042 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5