ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
IRC M1307.3
by gfretwell. 08/21/18 08:30 PM
The greenhouse job
by gfretwell. 08/21/18 08:26 PM
Upgrade the old panel
by HotLine1. 08/21/18 08:14 PM
Light Pole Grounding
by HotLine1. 08/20/18 05:34 PM
Calling all Non-US members!! (Non-US only)
by Bill Addiss. 08/13/18 05:52 PM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 10 guests, and 22 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Tamper resistant outlets #211012
09/03/13 09:44 PM
09/03/13 09:44 PM
S
sparkync  Offline OP
Member
Joined: Oct 2002
Posts: 830
NC
What Code was tamper resistant outlets first required throughout the house?? thanks

Work Gear for Electricians and the Trades
Re: Tamper resistant outlets [Re: sparkync] #211013
09/03/13 10:06 PM
09/03/13 10:06 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,003
Brick, NJ USA
2008 with changes in 2011


John
Re: Tamper resistant outlets [Re: sparkync] #211014
09/03/13 11:44 PM
09/03/13 11:44 PM
S
sparkync  Offline OP
Member
Joined: Oct 2002
Posts: 830
NC
Thanks John. I have a friend who started a house in 2011. He had already bought the insulation and is just now putting it in. The code has changed about the type insulation has to be put in a house, since 2011, but the inspector told him since he got his permit in 2011 before the changes, that he could use it what he had. He then started thinking about the tamper resistant outlets, whether he needed them or not. But I told him I was pretty sure it was before 2011 when it was required. Thanks

Re: Tamper resistant outlets [Re: sparkync] #211016
09/04/13 09:29 AM
09/04/13 09:29 AM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,003
Brick, NJ USA
NJ rules are basically the same regarding permit issue dates.



John
Re: Tamper resistant outlets [Re: sparkync] #211021
09/04/13 02:57 PM
09/04/13 02:57 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,256
Estero,Fl,usa
Florida only enforces the code on the day the permit was stamped. That causes a long line at the desk on the last few days of a permit cycle wink


Greg Fretwell
Re: Tamper resistant outlets [Re: sparkync] #211022
09/04/13 10:13 PM
09/04/13 10:13 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,003
Brick, NJ USA
A little further...
NJ style....
Comments are taken on the 'new' NEC for a period of time (45-90 days)
Comments are reviewed, rejected, or accepted as amendments.

A period of time passes, and the 'new' NEC is adopted, with amendments, and entered into the State Register.

A 'drop dead' date (usually 3-6 months) is set, and on that date the 'new; NEC is mandatory.

Yes, there is a minor rush IF there are major changes.

In that confusion, ECs are required to do the 9 hour code change CEUs on the 'new' code. Still working under the 'current' code, and on 'Rehab' work, using one code back.



John

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
renosteinke
renosteinke
Blue Collar Country
Posts: 5,316
Joined: January 2005
Show All Member Profiles 
Top Posters(30 Days)
sparky 4
BigB 3
Popular Topics(Views)
248,688 Are you busy
186,426 Re: Forum
175,910 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.024s Queries: 15 (0.003s) Memory: 0.9767 MB (Peak: 1.1272 MB) Zlib enabled. Server Time: 2018-08-22 01:39:03 UTC