ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Dec 2011
Posts: 31
Member
As part of a package of work that a customer wants me to do in his store he also wants me to move an existing neon sign from the back of the store to the front (inside installation and existing). My question is basically, do electricians normally do this type of work or is it usually done by the neon sign guy? I just don't want to sound like I am inexperienced to my customer but have my hesitation on doing this part of the job. I am concerned that if I tell him I don't want to do this part of the job I may loss the rest of the work to another electrician. I would think that this type of work is best performed by someone specializing in this. I know you have to use special transformers etc. But after reading some neon sign makers websites they make it sound so simple that you take your shipped sign out of the box and hang it up. But this sign is ganged with others. I also know that these signs are expensive and just one mistake and I could loss the money I make on the rest of the job but if I tell him an electrician normally does not do this type of work and he has to call a sign job I don't want him telling me that he had an electrician hook up the other ones.

What is usally the story with neon signs? Is it usally part of an electricians pocket of tricks depending on his experience or other?

Any advise would be very welcomed. I need to quote him on the rest of the job within a few days.

Thanks

Joined: Jul 2007
Posts: 1,335
S
Member
It varies area to area. What are you willing to risk? Got the know how and creds if required by ahj if required?


"Live Awesome!" - Kevin Carosa
Joined: Dec 2011
Posts: 31
Member
sparkyinak: Thanks for the quick reply. I figure this type of install would be like an instal for a central air for a residence. I would bring the power to the point of hook-up and then the guy installing the AC would do his hook-up and install.

As far as our Authority Having Jurisdiction and my credentials; I have not run it by the director of codes here in town who I know pretty well. I know he has been very busy with the storm - Sandy - we just had in Penn; it went right over our heads.

Personal Note: I have always wanted to go to Alaska; it seems that it would be a wonderful experience.

Joined: Feb 2003
Posts: 368
M
Member
Sub it out to a sign contractor?

Joined: Dec 2011
Posts: 31
Member
mbhydro: Thanks for your suggestion; I believe subbing is what I will do.

Thanks

Joined: Jul 2007
Posts: 1,335
S
Member
Originally Posted by AFJES
Personal Note: I have always wanted to go to Alaska; it seems that it would be a wonderful experience.


To add to your side note, I always tell anyone with a real ambition to visit Alaska is don't wait. You will kick yourself in the butt once you get here for waiting. Hock the kids if you need to grin


"Live Awesome!" - Kevin Carosa
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
We had fun in Alaska about 7 years ago. Flew into Fairbanks, drove around for 3 weeks and flew out of Anchorage. I liked the Kenai the best Seward to Homer.


Greg Fretwell
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
AFJES,
Bear in mind that you will be working with 2 entirely different hazards here.
The first being voltages of up to or in excess of 50kV, depending on the size of the sign.
I've worked on relatively small signs of 18' x 6' and they have used voltages in the area of 40-45kV.
This is not something you want to mess with, if you can avoid it.

The second hazard is that of the fragility of the neon tubes themselves, while they will be braced to a certain degree, during the moving of a lighting install like this, if a crane operator bangs the box against anything, it is usually "game over", the tubes after having been used before, become more fragile.

Personally, I would get a speciallised sign company to do this for you.
And let's get one thing straight here, it is NOT an admission of the fact that you can't do the work, in this situation, it is more like you need speciallised help to effect the desired result.

Joined: Dec 2011
Posts: 31
Member
Yup!! My mind is set. I'll leave it to the experts in that field. Sub-it-out.

Trumpy: Good advice (like others here) too much voltage for my liking and one tiny Boo-Boo and there goes anything I can make on the job and then some. Don't want the liability. Also thanks for your note: "And let's get one thing straight here, it is NOT an admission of the fact that you can't do the work, in this situation, it is more like you need speciallised help to effect the desired result." - I feel better now.

sparkyinak: I will make it there before I die for sure; just don't know when yet. I have done quite a bit of traveling in my life: Hong Kong, China, Philip's, Korea, Japan, most every state in the US (except Alaska) and have lived in the Rockies. Have seen wonderful sites. I flew over the Alaskan Tundra on a flight from Chicago to Japan;; unbelievable clear day and it was great seeing it from 30k feet. I had an invite to vacation in Autralia (never been there) and would only have had to pay for flight but turned it down at the time; Yes, I want to kick myself in the butt for not taking the trip.


Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
120 volt, 20 amp circuit by electrician, connected to a disco (SP switch) & rest is a neon guy. I have done neon as part of a service contract with a natl chain, and unless you have access to a neon shop, and a sign supply house...don't get involved. Break a neon skeletal tube...where to get it repaired or replaced?? Hence the need for a neon shop.

Most (key word) are limited to 15KV xfr output here (UL).

IMHO leave it to a sign guy, you probably don't need the liability.