I am going to guess that the left side module on the DSLAM was an add on after the initial instal.
Otherwise the splicers would never have been able to open the distribution box to make the initial connections to the underground lines.
To move either one would take time and money to splice and I hear in the US some telco's don't want to spend either on copper lines.
|
|
|
|
Joined: Sep 2011
Posts: 8
New Member
|
mbhydro, It's Canada. I am not sure about details. Just a fact.
|
|
|
|
Joined: Jun 2006
Posts: 613
Member
|
Maybe the small box is replaced by the big one? they are both telco.
Last edited by mikesh; 09/26/11 06:57 PM.
|
|
|
|
Joined: Oct 2006
Posts: 745
Member
|
Pedestals with louvered doors are almost exclusively used for CATV. This is because all of their gear is designed for outdoor (aerial use). Louvered doors aren't used for telco splices because of the potential for moisture.
Don't forget that this pedestal is double-sided, so it is possible that everything in there is completely accessible from the other side.
Then again if it is CATV, since when do they and the telcos get along, especially now that they are in competition with each other?
---Ed---
"But the guy at Home Depot said it would work."
|
|
|
|
Joined: Feb 2002
Posts: 2,233
Member
|
You might need the skinniest service man to work on that box.
|
|
|
|
Joined: May 2005
Posts: 247
Member
|
It does not appear to me that the pedestal is double sided. There may be a removable panel on the other side, but the doors open (or not) towards the blocked side.
|
|
|