ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
PLC/HMI Enclosure C2, D1
by ghost307. 10/16/18 03:31 PM
Tingle off the water spigot
by dsk. 10/15/18 02:36 PM
Board tester power supply?
by JoeTestingEngr. 10/13/18 12:14 AM
Voltage sag
by Trumpy. 10/12/18 06:59 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 36 guests, and 27 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 4 1 2 3 4
Crazy Inspection Interpretations #192573
02/18/10 09:11 AM
02/18/10 09:11 AM
F
FountainGuy  Offline OP
Member
Joined: Mar 2006
Posts: 30
Lawrenceville,GA, U.S.A
Absolutely no disrespect to Inspectors, but is there a blog or a list of crazy interpretations from inspectors out there? Probably well over 90% of Inspectors do a fine job, but every once in a while, an Inspector will come up with a whopper that just throws common sense out the window!

Work Gear for Electricians and the Trades
Re: Crazy Inspection Interpretations [Re: FountainGuy] #192575
02/18/10 10:37 AM
02/18/10 10:37 AM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,035
Brick, NJ USA
Based on the collective amount of years of experience of the forum members....this should get interesting!

I'm going to make this a sticky & see what happens.

My comments to follow....


John
Re: Crazy Inspection Interpretations [Re: HotLine1] #192576
02/18/10 10:58 AM
02/18/10 10:58 AM
R
Rewire  Offline
Member
Joined: Feb 2008
Posts: 165
Missouri
I installed a cord and plug sump pump the inspector failed because I did not have a "disconnect" installed before the receptacle outlet.

Re: Crazy Inspection Interpretations [Re: Rewire] #192578
02/18/10 11:18 AM
02/18/10 11:18 AM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,274
Fullerton, CA USA
I had 1 city inspector that wanted a copper EGC run through all EMT, with bonding bushings on each end.... of every box in the place!

He claimed that the zinc locknuts on the set screw connectors didn't provide an effective grounding path.
(He had recently attended a seminar on grounding & bonding, and must have fallen asleep during the bulk of it)

We appealed it to the AHJ of course, and won.



Re: Crazy Inspection Interpretations [Re: Rewire] #192579
02/18/10 11:23 AM
02/18/10 11:23 AM
G
ghost307  Offline
Member
Joined: May 2005
Posts: 955
Chicago Illinois USA
I was walking a job with one of the Inspectors when we passed by the Service Equipment. This large building had 3 services, 208V for general power, 480V for the Mechanicals and 208V Emergency. It was all sequence stuff...no single main in any of them. 208V Switchboard (6 disconnects), 480V Switchboard (5 disconnects) and EM Panel (3 disconnects).

He told me that it was a lucky thing that this was an existing installation because if he were inspecting it under the new Code (based on the 1999NEC) he would knock it down for having more than 6 disconnects.

I told him that there were less than 6 disconnects for each service...and he proceeded to tell me that the Code limitation was 6 disconnects in the entire building.

I wonder what he does with Hospitals and high-rise office buildings.


Ghost307
Re: Crazy Inspection Interpretations [Re: ghost307] #192581
02/18/10 02:17 PM
02/18/10 02:17 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,298
Estero,Fl,usa
Aw come on, inspectors are always 100% correct when it comes to code interpretations. BTW Did I tell you about this great bridge I have for sale?
I have been to IAEI meetings where people in the same department were arguing about what the code says.
Grounding is always a place for disagreeing. That grounded neutral in the meter pan can always start a fight. "can you have a metal nipple to the service disconnect enclosure?" "parallel neutral" yada yada

We have 2 adjoining jurisdictions with opposite readings.
They even tried to clean up the language in 99 (or 02?) but old fights die hard.

The other one is, "can you use a turned up rebar for the connection to the Ufer?"

Again jurisdictions that touch, disagree. I do feel sorry for contractors. Maybe they should have a GPS Nav application that gives you code references based on location wink


Greg Fretwell
Re: Crazy Inspection Interpretations [Re: gfretwell] #192594
02/19/10 12:26 AM
02/19/10 12:26 AM
F
frenchelectrican  Offline
Member
Joined: Feb 2003
Posts: 939
Wi/ Paris France { France for ...
Originally Posted by gfretwell
I do feel sorry for contractors. Maybe they should have a GPS Nav application that gives you code references based on location wink


Gregg.,

You are on something on this one I can belive it due I know couple city in Wisconsin have that kind of headache you almost have to use the GPS 100% of the time unless you know which area you are expecting to follow the regulations.

Merci,Marc


Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)

Re: Crazy Inspection Interpretations [Re: frenchelectrican] #192601
02/19/10 09:05 AM
02/19/10 09:05 AM
F
FountainGuy  Offline OP
Member
Joined: Mar 2006
Posts: 30
Lawrenceville,GA, U.S.A
Rewire, regarding the sump pump, I think the inspector wants a means of disconnect besides the circuit breaker since the pump motor is greater than 1/18 HP. But the Inspector has a great imagination when it comes to where the disconnect should be located. I wonder if the inspector knows, or cares, that sump pump manufacturers void warranty if you cut off the plug.

Re: Crazy Inspection Interpretations [Re: FountainGuy] #192602
02/19/10 10:59 AM
02/19/10 10:59 AM
R
Rewire  Offline
Member
Joined: Feb 2008
Posts: 165
Missouri
Originally Posted by FountainGuy
Rewire, regarding the sump pump, I think the inspector wants a means of disconnect besides the circuit breaker since the pump motor is greater than 1/18 HP. But the Inspector has a great imagination when it comes to where the disconnect should be located. I wonder if the inspector knows, or cares, that sump pump manufacturers void warranty if you cut off the plug.
remove the plug from the receptacle and you have disconnected the motor

Re: Crazy Inspection Interpretations [Re: Rewire] #192606
02/19/10 11:19 AM
02/19/10 11:19 AM
G
ghost307  Offline
Member
Joined: May 2005
Posts: 955
Chicago Illinois USA
In some places you'd need the GPS tied to Facebook.

The interpretation varies between cities, but within the city limits it can vary based on who you get as an Inspector that day for that job.


Ghost307
Page 1 of 4 1 2 3 4

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Show All Member Profiles 
Top Posters(30 Days)
sparky 11
Popular Topics(Views)
250,305 Are you busy
187,944 Re: Forum
177,473 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.026s Queries: 16 (0.004s) Memory: 1.0308 MB (Peak: 1.2128 MB) Zlib enabled. Server Time: 2018-10-16 21:22:45 UTC