ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
2017 NEC Changes
by HotLine1. 12/11/17 12:10 PM
Casino Wiring methods
by HotLine1. 12/09/17 10:44 AM
Ground wire Size to water Line.
by HotLine1. 12/05/17 12:11 PM
Flexible conduit to an outside Spa
by gfretwell. 12/05/17 12:28 AM
Dimmable LED 2x4 lay in fixtures
by Vulsion. 11/30/17 06:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
243,015 Are you busy
179,418 Re: Forum
170,377 Need opinion
Who's Online Now
0 registered members (), 22 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#183795 - 01/22/09 03:15 PM estimating blues  
bot540  Offline
Member
Joined: Sep 2004
Posts: 174
Vernon Hills, IL
Sometimes I feel estimating can be a guessing game on some levels. I am in the market for a good estimating software and was looking for sugestions. We are a smaller company and bid on quite a few retail buildouts. Does anyone have any luck with thier software.


Jesus may have been a capenter,but God was an electrician.Genesis1:3

Business, Office, Estimating, Legal:

#183840 - 01/23/09 07:52 PM Re: estimating blues [Re: bot540]  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Originally Posted by bot540
Sometimes I feel estimating can be a guessing game on some levels.


Estimating should be a guessing game, if you have the proper data, an estimate can be right on, and deviver a decent profit every time, the guys with the crystal ball prices, usually end up with a net loss over a period of time.


#183861 - 01/24/09 02:03 PM Re: estimating blues [Re: LK]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,140
Estero,Fl,usa
I did some estimating when we were writing "services" contracts at IBM. There are basically 3 areas you have to address. "Materials", "labor, including travel" and the hardest to estimate "risk". That is the amount you have to add for things you forgot or what just pops up after you start. Underestimating risk is the one that kills your profit when you hit that water pipe or your helper spills the cherry kool-ade on the marble stair case.


Greg Fretwell


Member Spotlight
MarkC10
MarkC10
CA, Inland Empire
Posts: 43
Joined: September 2013
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 15 (0.002s) Memory: 0.7537 MB (Peak: 0.8787 MB) Zlib enabled. Server Time: 2017-12-12 20:03:08 UTC