ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Safest socket system for wet pottery studio?
by Jules69. 02/21/18 05:12 PM
diazed fuses
by Texas_Ranger. 02/21/18 10:22 AM
110.26
by gfretwell. 02/18/18 12:14 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 5 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Commercial job estimate ( practice) #177707
05/10/08 01:29 PM
05/10/08 01:29 PM
S
sparkync  Offline OP
Member
Joined: Oct 2002
Posts: 830
NC
I am thinking about doing some estimates on bigger projects, but would like to have a practice bid first. Does anyone have a project that you have bid on and won, that I might be able to pratice on? I would like to figure the price, and see how close I come to your winning bid. I would like to try this "Before" I try an actual bid. I mostly do small work, though I have done large jobs before when I worked for "the other man". If you have one or know of one that I might try, it would be greatly appreciated. Thanks... Steve

Business, Office, Estimating, Legal:
Re: Commercial job estimate ( practice) [Re: sparkync] #177711
05/10/08 03:31 PM
05/10/08 03:31 PM
S
sparkyinak  Offline
Member
Joined: Jul 2007
Posts: 1,328
Alaska
The only practice that will help is jumping in with both feet. Let's say for a moment that you do get a old bid from some one. It will not help you in what you are looking for. Some of the reasons are like cost location factors, rising prices for material and fuel. Just because you think you can beat someone elses bid doesn't make you a good bidder. The bid you are trying to beat could have missed things. You know what your company is capable of. Look for projects that you know that you can handle and bid on them and pad it some. As your experience and cofidence grows, you will get some of the projects if your prices are reasonable. Just do not bite off more then you can chew AND READ THE FINE PRINT!!!. The devil is in the details.

Last edited by sparkyinak; 05/10/08 03:33 PM.

"Live Awesome!" - Kevin Carosa
Re: Commercial job estimate ( practice) [Re: sparkyinak] #177756
05/11/08 11:59 AM
05/11/08 11:59 AM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Steve,

Estimating skills take years of practic to develope, and you need a good mentor to teach these skills, the statement low bids do not always win the jobs is true, when i worked for a company on the other end of things, I would sit in on the bid reviews, I was shocked to see the larger percent of bid winners were at or near the higher end of the project, many of your better companies, the ones with the ability to pay are looking for contractors with the experience, and a good track record on past projects, also the note to "READ THE FINE PRINT!!!. The devil is in the details, is critical in every bid.

There are classes on estimating, that have qualified instructors that can help you along the learning curve.

Re: Commercial job estimate ( practice) [Re: sparkync] #177757
05/11/08 12:05 PM
05/11/08 12:05 PM
A
A-Line  Offline
Member
Joined: Jul 2004
Posts: 272
Utah, USA
I recommend this book. It has some practice estimates in it that include a Bakery, Drug Store, Beauty Salon, Doctor's Office and Insurance Office. It steps you through the wole process of estimating these jobs.
http://mikeholt.com/EstimatingSoftware.php

Re: Commercial job estimate ( practice) [Re: A-Line] #177759
05/11/08 12:41 PM
05/11/08 12:41 PM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Originally Posted by A-Line
I recommend this book. It has some practice estimates in it that include a Bakery, Drug Store, Beauty Salon, Doctor's Office and Insurance Office. It steps you through the wole process of estimating these jobs.
http://mikeholt.com/EstimatingSoftware.php


If you can not find a local course, that is an excellant book.

Re: Commercial job estimate ( practice) [Re: LK] #178108
05/23/08 02:17 PM
05/23/08 02:17 PM
W
wewire2  Offline
Member
Joined: Nov 2002
Posts: 244
California
In my humble opinion,
you can calculate, figure, scrutinize and tally
all you want. The jobs usually won't go for more than what the market will bear. When the market is tight some contractors are so hungry they actually lose money in their quest to get back to work. Start by Figuring all the material and other overhead costs.
Break the job down into as many little segments as possible and put a labor figure on each task. Add the labor up and see if you get a warm fuzzy feeling inside when you visualize yourself signing the contract to actually do the job. After testing the market for a while you will get the feel of what the jobs are going for. Keep trying to push the envelope to get the best price you can for your services. If you are landing almost every job, it's time to beef up the bids a little. More info than you asked for but I thought it might also help other newbies.

Re: Commercial job estimate ( practice) [Re: wewire2] #178625
06/06/08 08:07 PM
06/06/08 08:07 PM
S
sparkync  Offline OP
Member
Joined: Oct 2002
Posts: 830
NC
I just got a chance to do a considerably small commercial bid. (1) 3phase 100 amp panel, and (1) 400 amp 3 phase panel fed out of an existing traugh, 1440 sq. ft., mostly lighting, few receptacles, HVAC, etc. This seems to be about what I was looking for earlier. I expect I'll be bidding against some more experienced bidders, but I got to start sometime. Seems like if I'm ever going to really make it, commercial is the way to go. Seems like residential is slowing down anyway due to the economy in my area. Maybe this is my start in the big times smile


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 222
Joined: March 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 8
Popular Topics(Views)
244,049 Are you busy
181,040 Re: Forum
171,282 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.9872 MB (Peak: 1.1411 MB) Zlib enabled. Server Time: 2018-02-22 08:57:25 UTC