ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
220/230/240V 60Hz Systems
by gfretwell. 09/16/18 12:37 PM
Acronis Backup 2017
by gfretwell. 09/16/18 12:46 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 31 guests, and 24 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Meter Load Center #177393
05/01/08 12:45 PM
05/01/08 12:45 PM
J
JValdes  Offline OP
Member
Joined: Jun 2007
Posts: 301
South Carolina
If I install a meter load center (meter can and breaker combo) can I use a lug panel for the main service panel?

Work Gear for Electricians and the Trades
Re: Meter Load Center [Re: JValdes] #177394
05/01/08 01:21 PM
05/01/08 01:21 PM
B
BryanInBalt  Offline
Member
Joined: May 2007
Posts: 47
Baltimore
The meter combo IS the main service panel.
The panel on the inside will be a 'sub' panel; assuming it is fed from a breaker in the outside panel.
And don't forget to pull a ground too. wink

I'd still use another main panel inside though.


Design-Build isn't supposed to mean design *as* you build.
Re: Meter Load Center [Re: BryanInBalt] #177396
05/01/08 01:40 PM
05/01/08 01:40 PM
E
EV607797  Offline
Member
Joined: Oct 2006
Posts: 745
Fredericksburg, VA, USA
I doubt that I'd install a main in the sub panel since it is within the same building. Still, those panel packages that come with a main PLUS a selection of breakers are sometimes less expensive than buying a MLO panel and the same breakers that come with the package. Kind of hard to argue at that point.

A 100 amp MB panel with five SP 20 amp breakers (Square D Homeline) is only $60.00. In that case, the customers are getting a main breaker whether they need it or not.


---Ed---

"But the guy at Home Depot said it would work."
Re: Meter Load Center [Re: EV607797] #177397
05/01/08 01:49 PM
05/01/08 01:49 PM
J
JValdes  Offline OP
Member
Joined: Jun 2007
Posts: 301
South Carolina
Thanks folks, that clears that up.....John


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Joe Tedesco
Joe Tedesco
Boston, Massachusetts USA
Posts: 2,749
Joined: October 2000
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 11
Popular Topics(Views)
249,377 Are you busy
187,309 Re: Forum
176,652 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.017s Queries: 15 (0.004s) Memory: 0.9591 MB (Peak: 1.0926 MB) Zlib enabled. Server Time: 2018-09-22 17:39:53 UTC