ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
2020 is at the printers.
by gfretwell. 05/22/19 10:11 AM
Chinese wire symbols?
by Texas_Ranger. 05/19/19 03:09 PM
Pool - Daisy chained GFCI
by gfretwell. 05/18/19 01:30 PM
110.26 working clearances
by HotLine1. 05/14/19 02:08 PM
Parallel SER Cables
by George Little. 05/03/19 05:42 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 11 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Meter Load Center #177393
05/01/08 12:45 PM
05/01/08 12:45 PM
J
JValdes  Offline OP
Member
Joined: Jun 2007
Posts: 301
South Carolina
If I install a meter load center (meter can and breaker combo) can I use a lug panel for the main service panel?

Work Gear for Electricians and the Trades
Re: Meter Load Center [Re: JValdes] #177394
05/01/08 01:21 PM
05/01/08 01:21 PM
B
BryanInBalt  Offline
Member
Joined: May 2007
Posts: 47
Baltimore
The meter combo IS the main service panel.
The panel on the inside will be a 'sub' panel; assuming it is fed from a breaker in the outside panel.
And don't forget to pull a ground too. wink

I'd still use another main panel inside though.


Design-Build isn't supposed to mean design *as* you build.
Re: Meter Load Center [Re: BryanInBalt] #177396
05/01/08 01:40 PM
05/01/08 01:40 PM
E
EV607797  Offline
Member
Joined: Oct 2006
Posts: 745
Fredericksburg, VA, USA
I doubt that I'd install a main in the sub panel since it is within the same building. Still, those panel packages that come with a main PLUS a selection of breakers are sometimes less expensive than buying a MLO panel and the same breakers that come with the package. Kind of hard to argue at that point.

A 100 amp MB panel with five SP 20 amp breakers (Square D Homeline) is only $60.00. In that case, the customers are getting a main breaker whether they need it or not.


---Ed---

"But the guy at Home Depot said it would work."
Re: Meter Load Center [Re: EV607797] #177397
05/01/08 01:49 PM
05/01/08 01:49 PM
J
JValdes  Offline OP
Member
Joined: Jun 2007
Posts: 301
South Carolina
Thanks folks, that clears that up.....John


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
cookcc
cookcc
California ,Long Beach
Posts: 28
Joined: May 2007
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
255,113 Are you busy
191,211 Re: Forum
180,972 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.021s Queries: 15 (0.004s) Memory: 0.9590 MB (Peak: 1.0924 MB) Zlib enabled. Server Time: 2019-05-22 17:49:32 UTC