Photo's and info submitted by ECN Member
NORCAL.
Panels and homeruns in wall dividing 2 garages:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM001.JPG)
Other pic of homerun:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM002.JPG)
View looking out through downstairs unit garage:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM003.JPG)
10/2 dryer feed for downstairs unit:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM004.JPG)
Waste of wire and "other" issues:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM005.JPG)
See any problems w/ the placement of the smoke alarm and the use of 12/2 for it?:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM006.JPG)
More bundles:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM007.JPG)
Closeup of hacked up top plate penetrations:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM008.JPG)
It was always proper for 10/2 NM for a dryer feed,not!:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM009.JPG)
Stringing NM anyway they want in downstairs unit:
![[Linked Image]](https://www.electrical-contractor.net/mt/RM010.JPG)
Nice hole drilling job:
[img]
https://www.electrical-contractor.net/mt/RM011.JPG[/img]
Lower part of same studbay going through the floor into the garage:
[img]
https://www.electrical-contractor.net/mt/RM012.JPG[/img]