ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 265 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Sep 2003
Posts: 114
B
Member
Up to this point I've pretty much done small jobs and service work. I just got roped into a large remodel (electrical +30k not including fixtures) and the change orders are piling up. I'm guessing the change orders are up to 10k or so. I'm finding it difficult to keep track of the change order credits/debits for rough and trim parts. I made a spread sheet in excel and have been religiously keeping track of it but I'm wondering if there is any examples or ideas you guys can share with me.

Thanks,
Byron

Latest Estimating Cost Guides & Software:
Joined: Mar 2001
Posts: 2,056
R
Member
bwise,

I use excel also. The hardest part for me is stopping to note the extras and then finding time to enter everything as soon as possible.

Joined: May 2005
Posts: 706
T
Member
If you get the money for COs in advance, all you have to do is look at your deposit slips. Otherwise, your CO should spell out the change in total dollars.

Dave

Joined: Aug 2007
Posts: 853
L
Member
I have done change orders NET 30. This stems the flow and helps to keep track.Treat anything above the contract as service.

I will addmit, I have not owned a project with thesae #s.

Joined: Jul 2002
Posts: 717
M
Member
bwise, here comes your mactip, and a little speech. Tip: have a premade change order sheet supply with you at all times when doing full size jobs. At the very least, in your truck. Each and every change or extra should be written up, priced, and signed by a party who is authorized to sign for it. I said "should be" because that is in the perfect world. In reality you will face all sorts of arm twisting to get you to just jump in, do the work, and forget about that nasty change order business. The ones who do the twisting have all sorts of excuses why it is a bad endevor to disembark upon, chiefly they hold out carrots of future contract work with them. When they try that, it is best to suddenly reply "Geez, your delay in completing this transaction has resulted in additional cost, so now let me rewrite it and add that back into it."
Always try to get the full payment prior to doing any of the actual change work. This does not apply to any full fledged goverment or big work job, since they are never handled that way. But the signature on the paper is still tantamount to the operation. Take the completed and signed paperwork back to your office each day, use a two hole punch to punch out the top, and hang it on a two hole clipboard. I also use Excel spreadsheets for each project to track co's , but all I have to do to double check the payment progress is reach up to the clip board. Unpaid ones are still on it, paid ones are marked and filed into the job folder. That is the best way to keep track.

Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
not much to add, but I can't stress eniough how important it is to get them signed and approved by the person doing the payments, we try to get payment in advance, if not 10 days at the latest, enything past that and good luck on collecting anything.