ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
It's been an interesting career
by gfretwell - 05/23/22 09:29 PM
Material shortages???
by HotLine1 - 05/23/22 01:56 PM
Run Cap subsitution question. Two vs. one
by LarryC - 05/20/22 09:01 PM
New in the Gallery:
240/208 to a house
240/208 to a house
by wa2ise, October 9
Now you know.
Now you know.
by Tom_Horne, September 7
Who's Online Now
0 members (), 34 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Mar 2003
Posts: 849
Y
Member
Critical, Life safety, Equipment, and normal.
Remember FEEDERS not branch circuits.
Rubber covered MC Cable???? .Single phase 2 hots , neutal, ground.

Stay up to Code with the Latest NEC:


2020 NEC & Related Reference & Study Guides
2020 NEC & Related Reference & Study Guides
Pass Your Exam the FIRST TIME with these Exam Prep Combos:
 

>> Master Electrician Exam Prep     >> JourneyMan Electrician Exam Prep
 

Joined: Aug 2007
Posts: 853
L
Member
Yoop, Code quiz?

Not sure what your asking.

Joined: Mar 2003
Posts: 849
Y
Member
Question is. Is there any problem using rubber covered MC for hospital feeders??

Joined: Aug 2007
Posts: 853
L
Member
I see nothing to prevent it.
Appears that the critical items come in to play at the branch ckt level.

Joined: Jul 2007
Posts: 85
W
Member
From past experience, as a helper at the time. If I can recall correctly you need the 2 hour burn on all critical feeders.Which seems to me in a hospital all patient care areas. I remember using M.I cable for this a few tears back. I'd have to check my code book for the article numbers, thisis just off the top of my head. Also seems to me most hospitals I've done work in have panels dedicated to critical loads, usually having generator back up.

Joined: Mar 2003
Posts: 849
Y
Member
Yer thinking of Fire Pumps . Hospital feeders two hr fire rateing I don't think so.

Joined: Aug 2007
Posts: 853
L
Member
In Ma. We have the 2 hr rateing for feedrs.
However, Some inspectors have trouble diferentiating feedrs from branch ckts.

Joined: Mar 2003
Posts: 849
Y
Member
Doesn't Ma. use only the NEC?? I carried a Ma. License for yrs and took the test (Masters) in 1999 . I don't remember any additions to the NEC at that time.


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 187
Joined: November 2005
Top Posters(30 Days)
LarryC 3
Popular Topics(Views)
291,354 Are you busy
223,842 Re: Forum
209,243 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5