ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Changing a Bulb
by mbhydro. 07/21/18 05:57 PM
Opinions & comments
by HotLine1. 07/21/18 04:44 PM
Tray cable?
by gfretwell. 07/11/18 10:18 PM
Eaton Heavy Duty 30A and 60A Safety Switches
by Admin. 07/11/18 09:49 PM
ORTOVOX Recalls Avalanche Transceivers
by Admin. 07/11/18 09:44 PM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 18 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Large RV parK services #169725
10/13/07 03:43 PM
10/13/07 03:43 PM
Y
Yoopersup  Offline OP
Member
Joined: Mar 2003
Posts: 842
Michigan
Large RV park Power Co. brings in several services off of several transformers in Different locations.(spread out over large area one owner) Each service allowed up to Six Switches without a main . One transformers feeds two areas . It feeds 2-800 amp services back to back. Six disconnects each ? As each is a service.
Since there all out in the open they are Not feeding buildings or Structures. Makes for an interesting question.
Opinions please.
YoopersUP

2017 / 2014 NEC & Related Books and Study Guides
Re: Large RV parK services [Re: Yoopersup] #169730
10/13/07 07:10 PM
10/13/07 07:10 PM
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
The first thing to remember is that the NEC stops where the PoCo takes over. In most instances, we can consider the meter as this point.

So ... that would be six disconnects after each meter.

These are not to be confused with customer owned meters that there night be on each space.

If the meters at each pedestal are, in fact, PoCo meters, then the NEC does not apply to whatever feeds those meters.

Re: Large RV parK services [Re: renosteinke] #169732
10/13/07 09:10 PM
10/13/07 09:10 PM
Y
Yoopersup  Offline OP
Member
Joined: Mar 2003
Posts: 842
Michigan
Theres Never Meters at each Pedestal , You;d have over 100 meters or so in the park. They usually CT at the transformer . Then run to the Main Pnl. But even then the Service point for Each is at the panel, But one transformer has two service drops Ct'd at the transformer.( RV) parKs are awhole different ball game.Remember this is a RV park not a Trailer Park.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
richard
richard
L.I. New York
Posts: 95
Joined: August 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 5
Popular Topics(Views)
248,160 Are you busy
185,635 Re: Forum
174,999 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.020s Queries: 15 (0.004s) Memory: 0.9516 MB (Peak: 1.0786 MB) Zlib enabled. Server Time: 2018-07-22 14:05:28 UTC