ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Do you count seconds?
by Trumpy - 12/12/19 03:49 AM
FPE in Germany
by Trumpy - 12/12/19 03:29 AM
"Esoteric" countries and their wiring practices?
by Texas_Ranger - 12/02/19 10:52 AM
Look at this mess...
by NORCAL - 11/15/19 10:21 PM
New in the Gallery:
FPE in Germany pt.2
FPE Breaker panel in germany
Who's Online Now
0 registered members (), 1 guest and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Re: I am wiring a taco bell [Re: macmikeman] #168479 09/06/07 06:12 AM
Joined: Jun 2007
Posts: 1
M
masterinbama Offline
New Member
schedule?I did a project about 2 years ago consisting of 4 double ended 13KV unit subs 2000' of 5" grs conduit with 3 500 mcm 15KV cables each all in one room.Gc started day one about being behind I asked him to show me his schedule.The time line he showed me gave me 3 weeks to complete this work.I mumbled something about a dreamworld and walked away

Work Gear for Electricians and the Trades
Re: I am wiring a taco bell [Re: masterinbama] #168488 09/06/07 10:17 AM
Joined: Nov 2006
Posts: 348
I
ITO Offline
Member
Be careful of asking for a job schedule and getting the "three week" look ahead screw you over schedule.

Basically instead of scheduling all the work incorrectly they just do it three weeks out at a time so they can keep getting it wrong and doing it over and over ever week.


101° Rx = + /_\
Re: I am wiring a taco bell [Re: masterinbama] #168508 09/06/07 08:40 PM
Joined: Feb 2002
Posts: 840
C
CTwireman Offline
Member
Originally Posted by masterinbama
2000' of 5" grs conduit with 3 500 mcm 15KV cables each all in one room.


My back hurts just reading that. eek


Peter
Re: I am wiring a taco bell [Re: CTwireman] #168509 09/06/07 09:05 PM
Joined: Jul 2007
Posts: 265
W
wire_twister Offline
Member
Hope your tugger lasted through the job. Hate to have to pull that by hand.


Jimmy

Life is tough, Life is tougher when you are stupid
Re: I am wiring a taco bell [Re: Clydesdale] #169355 10/02/07 08:57 PM
Joined: Nov 2004
Posts: 138
C
Clydesdale Offline OP
Member
hey, been away for a few days(offline). The job is comming along great. we are putting the final touches on the interior lights now, and are about to start plugging, and switching...ha ha ha...swiching...there are literally only two 20A SPST switches in the whole place...everything is either constantly fed, or is switched by a contactor or time clock/photo cell. I have yet to lay my eyes on an ansel system, which should be here any day now. The site guys are busy trenching for my lot lights(20 footers) all I have to do is run the conduit, and pull the wires, and prefab up the heads on the poles, the GC is taking care of setting the lights....luckilly our shop has a crane for this stuff if it was up to me to set the poles(gotta get that CDL ASAP!!!)
As far as surprises go, I have only had one...a light in the wall of the cabinet where you line up to order was not on the prints....and I have no lighting circuit under there....I probably should have added a spare pipe for this but hey, I guess "next time" will have to be sufficient. I told the GC about this situation, and he didn't see anything wrong with having the light on all the time....problem solved!! Thanks again for all the input, I really appreciate it!!

nick.

Last edited by Clydesdale; 10/02/07 08:59 PM. Reason: speling...lol
Page 3 of 3 1 2 3

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 
Top Posters(30 Days)
andey 2
Trumpy 2
Popular Topics(Views)
261,327 Are you busy
196,498 Re: Forum
185,752 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3