ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Violation?
by renosteinke - 01/27/23 09:52 PM
Does NEC 551.71 (F) apply to dwellings?
by BigB - 01/20/23 10:46 AM
Power submeter connections
by HotLine1 - 01/19/23 09:09 AM
AFDD's coming to the UK
by Texas_Ranger - 01/17/23 07:22 PM
New in the Gallery:
Burger King crown sillyness
Burger King crown sillyness
by wa2ise, December 11
240/208 to a house
240/208 to a house
by wa2ise, October 9
Who's Online Now
0 members (), 26 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#167652 08/16/07 11:01 PM
Joined: Jan 2007
Posts: 59
D
Member
This may belong in another forum.You have a jacuzzi tub in a bathroom,residential.One situation has copper pipes throughtout the house and the other situation has all plastic plumbing EXCEPT the fuacets on the jacuzzi,copper.By code,INCLUDING the lug on motor,what is the grounding procedure here?Bouncing across state lines here and trying to keep alot of inspectors happy?Latest fella wanted one from service to motor only in situation number 2.

Joined: Mar 2005
Posts: 49
S
Member
Normally if all copper motor to water pipe.
If plastic- motor to circuit breaker panel

sandro2 #167660 08/17/07 07:27 AM
Joined: Dec 2003
Posts: 751
E
Member
680.74 requires metal piping systems and grounded metal parts in contact with the circulating water to be bonded together. If there are no metal pipes, then no bonding is required. You are making an equipotential grid. Never is it required to bond a hydromassage bathtub to the panel or the service. NEVER!!!!!!


Earl
Joined: Dec 2003
Posts: 751
E
Member
That said, it is still required to include an equipment grounding conductor with the branch circuit conductors feeding the motor, and that conductor is bonded inside the motor to any metal parts. But no additional bonding to the panel is required.


Earl
Joined: Mar 2005
Posts: 49
S
Member

I worked for an electrician in NJ. The Inspector failed the rough in because he wanted a ground wire ran from the motor bond lug to the CB Panel due to plastic plumbing.This was in Salem county Nj

sandro2 #167831 08/21/07 07:17 AM
Joined: Jul 2002
Posts: 717
M
Member
Originally Posted by sandro2

I worked for an electrician in NJ. The Inspector failed the rough in because he wanted a ground wire ran from the motor bond lug to the CB Panel due to plastic plumbing.This was in Salem county Nj

He had you do that because he doesn't know the difference between grounding, bonding, and equalpotential planes.

Joined: Nov 2005
Posts: 507
M
Member
dirty little secret in NJ...many electrical inspectors are failed electrical contractors for a reason...

Notice I said many...not all....many...


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC Now Available!
 
* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Posts: 362
Joined: April 2003
Top Posters(30 Days)
BigB 8
triple 3
Popular Topics(Views)
302,620 Are you busy
231,935 Re: Forum
216,579 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5