ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
dsk 13
Admin 5
Recent Posts
electircal ageing test on IPC
by SIAME. 08/15/17 02:43 AM
electrical aging test on IPC
by gfretwell. 08/15/17 12:27 AM
Bathroom electrical
by gfretwell. 08/14/17 02:05 AM
"Line level" audio on Cat 5?
by gfretwell. 08/08/17 10:39 PM
Fire alarm phone lines and color coding
by gfretwell. 08/08/17 10:26 PM
New in the Gallery:
Housebilding DIY wiring
Popular Topics(Views)
239,856 Are you busy
175,412 Re: Forum
167,704 Need opinion
Who's Online Now
0 registered members (), 48 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#161965 - 04/10/07 10:10 PM Big Boys Racketeers  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,450
NY, USA
Quote
We don't need no stinkin Racketeers - We've got a CAT!

4 x 500 MCM + 1 X 3/0 CU pull - somewhere in Maine! More photos if you want. Source is Cat generator - 140' away. 3 phase 480 - 1600 A. Total of 4 - 4" RMC, each as noted above. Application - paving plant.

Be gentle! We're out here in the woods!

Grov

[Linked Image]


Tools for Electricians:

#161975 - 04/11/07 07:02 AM Re: Big Boys Racketeers [Re: Admin]  
john p  Offline
Member
Joined: Nov 2006
Posts: 32
Bemidji,MN.USA
Nice wire stands, I see you have the lube ready. wheres the back hoe wire puller at grin


#161977 - 04/11/07 07:15 AM Re: Big Boys Racketeers [Re: john p]  
Grover  Offline
Member
Joined: Jan 2005
Posts: 109
Sebago, ME, USA
Actually didn't use the backhoe this time - see the forklift in the distance? Limited to 5' at a time - the height of the Gen enclosure door.

I remember another pull - excavator used to position pulley above pipe - rope to pickup truck......


#162334 - 04/17/07 03:55 PM Re: Big Boys Racketeers [Re: Grover]  
ShockMe77  Offline
Member
Joined: Jun 2005
Posts: 821
Rahway, New Jersey
That's awesome!

I don't normally work with the big stuff, but I'll remember this technique next time I do.


#162357 - 04/18/07 05:23 AM Re: Big Boys Racketeers [Re: ShockMe77]  
Luketrician  Offline
Member
Joined: Jul 2006
Posts: 272
Sale Creek, TN USA
Was that little bucket of lube enough for the pull? Seems like you would need a heck-of-a-lot more than that in the pic...I could picture someone right at the stub up, guiding the wires into the conduit with a big vat of polywater right next to him. Using generous amounts of it for the entire length of the pull. So how were yall set up? Was any of my speculation the case?

The more polywater the better!
smile



Luke Clarke
Electrical Planner for TVA.


#162360 - 04/18/07 07:29 AM Re: Big Boys Racketeers [Re: Luketrician]  
Grover  Offline
Member
Joined: Jan 2005
Posts: 109
Sebago, ME, USA
I used 3 buckets of lube for the pull - almost a bucket per pull. 3 helpers guiding wire off the spools and into the switchgear. I was at the stub-up, laying on a 2x10, waterproof gloves, doing the final guide into the pipe and slathering the lube. Continuous lube for the entire pull.

Grov



Member Spotlight
TOOL_5150
TOOL_5150
Bay Area
Posts: 61
Joined: August 2007
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.7775 MB (Peak: 0.9236 MB) Zlib enabled. Server Time: 2017-08-16 15:29:55 UTC