ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
Casino Wiring methods
by HotLine1. 12/09/17 10:44 AM
Ground wire Size to water Line.
by HotLine1. 12/05/17 12:11 PM
Flexible conduit to an outside Spa
by gfretwell. 12/05/17 12:28 AM
2017 NEC Changes
by luckyshadow. 12/04/17 06:08 PM
Dimmable LED 2x4 lay in fixtures
by Vulsion. 11/30/17 06:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
242,990 Are you busy
179,381 Re: Forum
170,345 Need opinion
Who's Online Now
0 registered members (), 17 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#160484 - 07/14/06 10:27 AM How Long should it take?  
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
What would your time estimate be to punch down 38 RJ-45 modular jacks, mount a wall rack, terminate 38 cables to a patch panel, and test all cables for opens, shorts, and reversed pairs.

I recently did this job T&M, I don't don't do this everyday and want to know how slow I am at it.

I'll post back with my actual time after I get some feedback.

[This message has been edited by golf junkie (edited 07-14-2006).]


Study Guides for VDV / Structured Cabling Installers

Voice, Data, Video, (VDV) Fiber Optics, Communications, Low Voltage,
Fire Alarm, Electronic Security Systems Installations & Related

NTC Low Voltage Training & NICET Exam Study Guides
Low Voltage Training & NICET Exam Study Guides


#160485 - 07/14/06 12:50 PM Re: How Long should it take?  
hbiss  Offline
Member
Joined: Dec 2003
Posts: 886
Hawthorne, NY USA
I can tell you it takes me about 5 minutes to terminate a jack and install the jack and plate on the wall. This would be to a plaster ring or previously cut in MPLS.

As for the patch panel, much depends on how the cable bundle is routed (I always prefer to bundle it down the wall surface from the ceiling to the patch panel). Also whether you subscribe to tagging the cables or ringing them out as you punch them down.

I prefer to work with another person. He will put tone on the wall jack, I will stay at the patch panel and locate the cable and punch it down. Then the other guy will replace the toner with the remote for the cable tester. I will do the test then move on to the next jack. To communicate we use Nextels or radios.

All told this will probably be about a days work for the both of us.

-Hal

[This message has been edited by hbiss (edited 07-14-2006).]



Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,141
Joined: May 2003
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.004s) Memory: 0.7484 MB (Peak: 0.8684 MB) Zlib enabled. Server Time: 2017-12-11 00:04:15 UTC