ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Multi Meter Service
Multi Meter Service

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 75 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#156528 05/13/05 05:35 AM
Joined: Apr 2005
Posts: 197
L
Member
I'm hoping I am not the only one doing this? We do commercial and industrial service work. Normally we get a service call and charge 1 hour travel and labor as required. (min 1 hour)
Here is the question; When we get an emergency service call, where we have someone pick up their tools, apologize to that customer advising they have to respond to an emergency. Respond to the emergency service call: For this service we charge overtime (x1.5) and travel at portal to portal. We charge OT regardless of time of day. Are we the ONLY EC doing this? Does this sound inappropriate? How do you bill emergency service calls??

Horizontal Ad
Joined: Dec 2004
Posts: 1,064
D
Member
Learjet9,

In my situation, it depends solely on who the customer is, that needs emergency service.

If it is one of my "better" customers, than point to point billing is applicable, at normal rates, during normal business hours. After hours is point to point at 1.5, for normal customers.

Now if it is someone, who I have never done work for, that needs emergency service, two thoughts have to come to mind. One is, I would not stop work for my better customers to go somewhere else, unless the work I was doing wasn't critical. That is why they are my customers, I am there for them. Two, who is this new customer, and what really is their emergency. If it warrants me to pack up and leave a job, then yes, 1.5 point to point would be warranted. During normal business hours, of course.

If it is a new customer, you have to think about trying to retain them, and a guy in business who needs emergency service, is probably loosing more in man hours, than you are charging anyway, so at 2X your rate, point to point, you are still pulling him out of a jam.


Dnk........

Joined: Apr 2005
Posts: 197
L
Member
Thanks DNKL - Here is the scenario more often than not; Elec on a job - gets pulled to go to an emergency service - the original job must still be completed as promised - now that he has spent the last 2 hours of his day on the emergency there is no 'regular' time left to complete the original job. Now that elec is on OT but we certainly cannot charge that customer OT as they did not create the need for OT hours. So, it means the customer with the emerg must pay the OT. Does that make any sense?

Joined: Dec 2004
Posts: 1,064
D
Member
Yup, that stuff happens.

That is why you bill emergency calls higher, because if the electrician stayed there and finished the job, he doesn't have wasted fuel, wasted time loading and unloading a truck, and time wasted time remembering where he left off.

Dnk....

Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
most commercial and industrial accounts, are paying min 2 to 4 hours for a service call, we just discussed this yesterday with one of our old industrial accounts, he said most of his vendors charge 4 hours min for a service call.
What was intresting is his comment, when i asked why pay 4 hours, he looked at me and said, what kind of electrician am i going to get, that charges one hour for an industrial call.

[This message has been edited by LK (edited 05-13-2005).]

Joined: Apr 2005
Posts: 197
L
Member
We received a service call from a retail store about an hour drive from the shop. The call was for 1 fixture not working. We responded, replace 1 ballast and charged an hour travel and 1 hour labor. The response from the customer was; "It took you a whole hour to replace 1 ballast."
The other response we have heard; We complete a job and the customer asks; How come that took so long to do? I answer; Why, how long does it generally take you to do that? Anyone have any better answers to that question?

Joined: May 2005
Posts: 706
T
Member
I think your reasoning is correct for charging overtime. I haven't heard the "took so long" comment in years. I usually get "that would have taken me SO much longer if I'd done it myself".

I'm thin skinned, so I'd probably take it as an insult if someone asked why it took so long. I wouldn't say it, but I'd be thinking...who are you going to call the next time you need an EC?

Dave

PS I like the 4 hour minimum. I must be in the wrong market. I'm still struggling with the free estimate thing.

Horizontal Ad
Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
Yes, it sounds like his charge is more then fair for a commercial account with his quick response, however industrial accounts usually take more time to service and require an electrician with a broad experiance, which usually demanding a higher rate of pay,that is why they get more for industrial calls.

Joined: Jan 2003
Posts: 4,391
I
Moderator
The company I work for charges a 4 hour minimum for any 'same day' service call. And the hours we charge are point to point.

It does not matter if it is an old or new customer.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Joined: Apr 2005
Posts: 197
L
Member
LK - That's correct, our rate for industrial service is higher for the reasons you stated. We provide emergency service, which to us means the customer wants you there right now, drop whatever your doing and respond. For this response we feel the overtime rate and the portal to portal travel is warranted. Many of our emergency service calls are completed in less than 1 hour. (Burning ballast, failed C/B, ETC)

Page 1 of 2 1 2

Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
Admin
Admin
NY, USA
Posts: 3,685
Joined: October 2000
Top Posters(30 Days)
Popular Topics(Views)
333,639 Are you busy
259,012 Re: Forum
240,428 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5