|
|
|
0 members (),
417
guests, and
39
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: May 2004
Posts: 1
OP
Junior Member
|
I'm in harrisburg PA.Remodeling 3 story steel frame Bld. contractor wants to use romex. There is a non plenum drop cieling. My understanding is you can't have any exposed romex in a drop cieling,plenum or not.Is this correct? Harrisburg is on 93 code. I want to use MC,don't want romex touching any steel.
|
|
|
|
|
Joined: May 2002
Posts: 1,716
Member
|
Under the 93 NEC you would be fine, as long as the building is not a; Place of Assembly, Commercial Garage, Theatre, or Motion Picture Studio.
I don't see a problem with NM touching building steel.
Roger
[This message has been edited by Roger (edited 05-13-2004).]
|
|
|
|
|
Joined: Jan 2002
Posts: 1,457
Member
|
'93 code? How often do you guys update? (Obviously not very)
|
|
|
|
|
Joined: Jun 2003
Posts: 1,143
Member
|
Not sure about '93 Code, but I think the plenum restriction for NM was there.
|
|
|
|
|
Joined: Mar 2004
Posts: 98
Member
|
Yea,I dont get it,Harrisburg in the USA? 93 code book. Or does each state take turns on which code book to use?Lets look in 334.12. 2002 NEC
|
|
|
Posts: 28
Joined: May 2007
|
|
|
|
|
|