ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 393 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 4 1 2 3 4
#153889 03/11/04 11:21 PM
Joined: Mar 2001
Posts: 345
T
Member
Was this ever resolved?
--
Tom H


Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#153890 03/26/04 08:12 PM
Joined: May 2002
Posts: 1,716
R
Member
I'm like Tom and would like to know too.

I hope I was wrong. [Linked Image]

Roger

#153891 03/30/04 04:20 PM
Joined: Oct 2003
Posts: 152
M
Member
Ravin hasn't posted since then.

I sent him an email. I'll let you know if he replies. I was curious too.

#153892 04/18/04 06:56 AM
Joined: Jun 2002
Posts: 6
R
ravin Offline OP
Junior Member
Hey fellows, Update regarding old/new work. Prior to my involvement,it seems AHJ told HO at time of his permit that if any existing partitions are exposed, that wiring should be installed as new work. When I looked at job to estimate, all the walls were covered with new rock, and HO did not tell me about AHJ instruction and nether did AHJ untill time of inspection. Worse than that for HO, he insulated all exterior walls with out inspection. Ispector was peaved at HO, wanted all rock removed, but since AHJ knows of my workmanship and overall quality of other installations, he only made HO expose areas where I installed new openings, meaning only open that bay, not expose entire wall. What an ordeal, all due to not being informed by HO. Thanks for your interest. Ravin.

#153893 04/18/04 07:35 AM
Joined: Jan 2002
Posts: 1,457
E
Member
So the walls were open then? Before or after you did your wiring? If they were closed before you did your wiring I have no problem with you fishing it in. This is still a legal wiriing method. I am not sure there is any code that specifies at what stage of construction you have to install wiring.

#153894 04/18/04 10:39 AM
Joined: Aug 2003
Posts: 1,374
R
Moderator
Quote
I am not sure there is any code that specifies at what stage of construction you have to install wiring.

Actually there is....
Quote
IRC109.1.2 Rough inspection of plumbing, mechanical, gas and electrical systems shall be made prior to covering or concealment, before fixtures or appliances are set or installed, and prior to framing inspection.


Edited for typo's

[This message has been edited by Ryan_J (edited 04-18-2004).]


Ryan Jackson,
Salt Lake City
#153895 04/18/04 03:33 PM
Joined: Oct 2001
Posts: 597
E
Member
Ravin,

What a can of worms.
Quote
. . .it seems AHJ told HO at time of his permit that if any existing partitions are exposed, that wiring should be installed as new work.
So, is your AHJ a "combination inspector" that is looking at more than one trade's work? Or, do I understand you to say that the HO pulled his own electrical permit?

Had the HO done any wiring under his permit? Or, was all the new wiring done by you?

[This message has been edited by ElectricAL (edited 04-18-2004).]


Al Hildenbrand
#153896 04/18/04 06:45 PM
Joined: Jan 2002
Posts: 1,457
E
Member
Ryan, to me that tells me when the systems must be inspected not when they must be installed. If the wiring was not yet installed there is nothing to inspect. This may be pushing it but what if a homeowner decides to gut, insulate and board a room. Then they realize the should have had the wiring updated. At this point they have an electrical contractor fish in all new wiring. While not ideal to me it is legal.

#153897 04/18/04 06:50 PM
Joined: Jan 2002
Posts: 1,457
E
Member
What I am getting at is what code tells me that if a wall is gutted it must be rewired to current code. And if it must be rewired, must it be rebuilt, replumbed and so on?

#153898 04/18/04 09:35 PM
Joined: Jun 2001
Posts: 642
N
Member
A can of worms is correct. As i see it the HO Knew of the requiirement to have any electrical work done as new work and failed to inform the EC of the inspectors' direction to the HO. I hope the HO got an expensive lesson in normal construction practices. The EC probably saved the HO some money because of his good work reputation.

I do not know of any code that requires new wiring,plumbing,etc just because a wall is opened up and replaced.

[This message has been edited by nesparky (edited 04-18-2004).]