ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Closet Meters
Meter Closet

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
1 members (Scott35), 90 guests, and 31 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 4,141
Likes: 4
Member
Does the Building Code mention providing access for motors on Hydromassage Bathtubs?

Bill


Bill
Horizontal Ad
Joined: Aug 2003
Posts: 1,374
R
Moderator
Not that I'm aware of.


Ryan Jackson,
Salt Lake City
Joined: Oct 2000
Posts: 4,141
Likes: 4
Member
I've heard of Electricians getting red-tagged because the framers didn't leave a proper access opening to service the Tub that the Plumbers put in.

It doesn't sound right somehow.

Bill


Bill
Joined: Jan 2002
Posts: 1,457
E
Member
680.73 in the NEC requires access without disturbing the building finish. I guess if it is not complied with it won't pass inspection. Sawzall please!

Joined: Oct 2000
Posts: 4,141
Likes: 4
Member
I've seen where the Plumber sells the Tub to the Homeowner and puts it in. The Electrician wires it and the GC/Framer and Customer don't want to leave an access panel for cosmetic reasons. The poor Sparky had no say in any of these decisions but is the one left holding the bag.

I think if the requirement for access was put in the other codes (Building & Plumbing) it would put the responsibility closer to where it belongs (in everyone's interest to comply). JMO

[Linked Image]
Bill

[This message has been edited by Bill Addiss (edited 11-05-2003).]


Bill
Joined: Aug 2003
Posts: 64
E
Member
IRC Section P2720.1: "A door or panel of sufficient size shall be installed to provide access to the pump for repair and/or repalcemnt."

Joined: Oct 2000
Posts: 4,141
Likes: 4
Member
eprice,

Yes! That seems to be in the Plumbing section.

So the Plumber shares responsibility for this access too. I'm glad to hear this. I think that's as it should be.

[Linked Image]
Bill

[This message has been edited by Bill Addiss (edited 11-12-2003).]


Bill
Horizontal Ad
Joined: Aug 2003
Posts: 64
E
Member
It is in the plumbing section, but I've always figured it was the framers' responsibility to put the access in right [Linked Image] When I do a rough inspection and I find a problem with this, I write it up with the other framing comments [Linked Image]

[This message has been edited by eprice (edited 11-13-2003).]

Joined: Oct 2000
Posts: 4,141
Likes: 4
Member
Quote
I've always figured it was the framers' responsibility to put the access in right
[Linked Image] [Linked Image]

Bill


Bill
Joined: May 2002
Posts: 1,716
R
Member
Our local inspectors will also tag an installation due to something under another code with an explanatory note and then they will usually notify the particular inspector be it plumbing, mechanical, fire marshall, or building.

Roger


Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,158
Joined: May 2003
Top Posters(30 Days)
BigB 6
Popular Topics(Views)
329,925 Are you busy
254,756 Re: Forum
237,179 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5