ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 381 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
#150060 09/07/04 10:53 AM
Joined: Jun 2004
Posts: 206
C
Member
Trumpy, Yes to your questions. We also keep a fire extinguisher with us.

It is not an enjoyable piece of gear to wear. I put the complete suit in its bag on a scale "22lbs". I would much rather wear this than experience the results of not having PPE. This suit is 100 CAL/CM2.

Arc Flash PPE Clothing, LOTO & Insulated Tools
#150061 09/07/04 10:31 PM
Joined: Jun 2003
Posts: 681
P
Member
I agree that this is going to be contentious, but if I can do my small part, I will.
I asked them to have gloves, a face sheild/helmet and long sleeve shirts that are not polyester. I provided the contractor with some info as to where to purchase this equipment.
The lack of PPE is so bad here, that there are no supply houses selling this stuff.

Pierre


Pierre Belarge
Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5